Home › Energy, Power & Waste › Coal and Energy Minerals in the Philippines — The Triple Structure of Semirara Island, Import Dependence, and Decarbonization

Coal and Energy Minerals in the Philippines — The Triple Structure of Semirara Island, Import Dependence, and Decarbonization

As of 2026-08-30 · Updated 2026-08-30 · Section: Energy, Power & Waste · 日本語版

Editor's note: This article covers a field in which the site's operating company has business interests. It is compiled from publicly available and primary sources.


0. Three points to grasp first

# Point Summary
1 A coal-producing country that is also an importer Domestic production (almost entirely from Semirara Island) runs at 15–20 million tonnes a year, while imports reached about 39.87 million tonnes in 2024 (DOE). Domestic coal is low-rank sub-bituminous, which by itself does not suit the boiler design of many power plants.
2 SMPC's Coal Operating Contract (COC No. 5) expires July 14, 2027 DOE will not extend it and is instead moving to competitive bidding. As of August 2026, the bidding process is delayed. On August 10, 2026, SMPC announced it would cut its production target by more than a third and lay off 462 workers. A year in which the Philippines' coal supply structure could shift fundamentally.
3 The moratorium is "still in force," but the loopholes are widening The 2020 moratorium on new coal power plants remained "in effect" as of May 2026. However, a DOE circular dated October 14, 2025 codified exemptions for own-use generation, off-grid projects, critical-minerals mining, and more.

1. The big picture — the Philippines' coal in numbers

1.1 The skeleton of supply and demand

Item Value Year Source
Domestic coal production (SMPC) 19.9 million tonnes (record high) 2025 SMPC disclosure (PSE, March 2026)
Same 16.0 million tonnes 2024 SMPC disclosure
SMPC's share of domestic production "About 97%" to "about 99%" 2024–2025 SMPC / IEA's Coal 2025
Coal import volume 39.872 million tonnes 2024 DOE statistics (cited in press)
Same 35.535 million tonnes 2023 DOE
Same 32.910 million tonnes 2022 DOE
Import-source share (Indonesia) About 98% 2024–2025 Press reports / shipping data
Domestic coal consumption (estimate) About 47 million tonnes 2025 IEA's Coal 2025
Same (outlook) About 54 million tonnes (+15% vs. 2025) 2030 IEA's Coal 2025

注 Point of common confusion ①: SMPC's "19.9 million tonnes of production" and "39.9 million tonnes of imports" cannot simply be added together and called domestic consumption. SMPC exports nearly half of its production (see Chapter 4 below). You need "production − exports + imports" to get supply.

注 Point of common confusion ②: Domestic production figures differ across sources. Enerdata puts 2024 lignite production at "15 Mt," which does not match SMPC's disclosed 16.0 million tonnes. This likely reflects differences in classification (lignite vs. sub-bituminous), calendar year vs. fiscal year, and pre- vs. post-washing figures. Always state which agency's statistic is being cited.

1.2 Position in the power mix

Indicator Value Year Source
Coal's share of power generation About 63% (RE about 22%) DOE data as of 2025 (cited in press) DOE
Same (different dataset) About 60% (gas about 18%) April 2025–March 2026 Low-carbon electricity data compilation
Coal's share of installed capacity 40.6% (RE 32.9%, gas 15.8%, oil 10.8%) December 2025 DOE
Coal power installed capacity 13,006 MW (41% of total capacity of 31,701 MW) July 2025 DOE, "List of Existing Power Plants"

On the claim that this is "the most coal-dependent grid in Southeast Asia": Ember's analysis states that the Philippines' share of coal in power generation rose from 59.1% (2022) to 61.9% (2023), surpassing Poland, China, and Indonesia. 注 However, this ranking is based on "share of generation," and by absolute volume the Philippines ranks 17th in the world (Ember, 2023 data). When writing "world's #X coal country," always specify the metric.


2. Resources and reserves — do not confuse the definitions

The most misused number in Philippine coal is "2.5 billion tonnes."

Term Figure Reference date Source / notes
Total coal resource potential 2.53 billion tonnes End of September 2005 DOE. Often mistakenly cited as "reserves"
Same (revised) 2.37 billion tonnes December 31, 2020 DOE
In-situ reserves 458 million tonnes (≈18% of potential) 2005 DOE
Same 315 million tonnes (13.29% of same) December 31, 2020 DOE
Figure described as mineable reserves 409.3 million tonnes (17% of same) 2020 Secondary analysis (reorganized DOE compilation)
Semirara coalfield resources About 570 million tonnes (sub-bituminous) — DOE-related materials. The largest of the 19 coal districts

注 Point of common confusion ③: - "Resource potential (endowment)" = the amount believed, on geological grounds, to exist. Does not consider economic viability or technical mineability. - "In-situ reserves" = an intermediate concept used by DOE. The amount confirmed within the strata by drilling, not the amount that can simply be extracted as-is. - "Mineable/recoverable reserves" = the amount that can actually be mined and recovered. Comes to a sixth or less of the figure above it.

On reporting standards: These DOE figures are government estimates and are not based on international public reporting standards such as JORC or NI 43-101. The only JORC-compliant material confirmed for SMPC is an independent technical review by Minarco Asia Pacific in November 2004 (proven/probable mineable reserves of 52 million tonnes at the Panian mine, in-situ coal of 210 million tonnes) and a mention of JORC-standard confirmatory drilling conducted in 2006 under the supervision of an Australian consultancy. No JORC-compliant resource statement as of 2026 could be confirmed in this research.

Major coal districts

19 coal districts (coal districts), dating from a 1977 survey, form the administrative units. The major ones are as follows.

Coal district Location Characteristics
Semirara Semirara Island, Antique The largest. Nearly all domestic production. Sub-bituminous coal
Cagayan–Isabela Northern Luzon Subject to a 2026 bidding round (Amulung, Iguig, Benito Soliven, Naguilian, Cauayan)
Sultan Kudarat Mindanao Said to hold large reserves
Malangas Zamboanga Semi-anthracite. Remaining reserves reported at just over 1 million tonnes
Cebu / Negros / Albay / Surigao del Norte Various Mostly small-scale underground mining

注 The Philippines' coal seams are highly folded and faulted, with poor continuity. They are also scattered across islands, making infrastructure development difficult. This is the geological reason large-scale development has not advanced outside Semirara Island.


3. Semirara Island and SMPC

3.1 Corporate structure

Item Details
Company name Semirara Mining and Power Corporation (SMPC, PSE: SCC)
History Established February 26, 1980 as Semirara Coal Corporation. DMCI Holdings gained control by 1999. Listed on the PSE in 2005. Renamed to its current name in August 2014, reflecting its move into power generation
Parent company DMCI Holdings, Inc. (the Consunji family)
Current CEO Isidro Consunji
President and COO Maria Cristina C. Gotianun
Power-generation subsidiaries SEM-Calaca Power Corp. (SCPC), 2×300 MW / Southwest Luzon Power Generation Corp. (SLPGC), 2×150 MW = 900 MW total (Calaca, Batangas)
Employees 4,045 (end-July 2026, of whom over 2,000 are from host communities)

SCPC's 2×300 MW units were acquired from the government (PSALM) in 2009 for US$362 million. SMPC is described as the country's only vertically integrated power company that owns both a coal mine and coal-fired power plants.

3.2 Production and results

Year Coal production Shipments Average selling price Consolidated net income
2024 16.0 million tonnes 16.5 million tonnes ₱2,853/tonne ₱19.63 billion
2025 19.9 million tonnes (record high) 15.4 million tonnes (−7%) ₱2,302/tonne (−19%) ₱13.06 billion (−33%)
2026 Q1 5.9 million tonnes (+4%) 4.5 million tonnes (−4%) — ₱3.8 billion (−12%)

(Sources: SMPC's PSE disclosures and various March/April 2026 press reports)

The 2025 production increase reflects improved access to the coal seams at the Narra mine and ECC amendment approval from DENR in May 2025 for annual production of up to 20 million tonnes. 2025 revenue was ₱52.23 billion (−20%).

The power business sold a record 5,296 GWh in 2025 (+7%), at an average selling price of ₱4.38/kWh (−8%). 54% of sales went through the spot market (WESM), 46% through bilateral contracts.

3.3 The scale of open-pit mining and the shifting of pits

Semirara Island's operation is a large-scale open-pit mine. The area covered by Coal Operating Contract (COC No. 5) is about 13,000 ha, of which the project area was expanded to 5,221.75 ha under the June 2025 ECC amendment.

Pit Operating period Notes
Unong 1984–2000 Closed
Panian 1999–2016 Once the country's largest coal mine. Site of the 2013 and 2015 slope collapses. Currently under rehabilitation
Molave 2016–November 2023 Cumulative output of 86.06 million tonnes
Narra 2016– Remaining reserves of 45.43 million tonnes (company estimate). Reported to be nearing depletion in 2026
Acacia Undeveloped Estimated reserves of 66 million tonnes. In drilling/preparation stage

The Narra mine was temporarily suspended in 2019 due to water seepage and resumed in October 2022. The deposit extends below sea level, and CEO Consunji has said it requires special techniques, with a remaining mine life of around 10 years (2026 press reports).

SMPC has submitted a five-year, roughly ₱291.4 billion (about US$5.07 billion) expansion plan to DENR. 注 However, due to the contract-expiration issue discussed below, 2026 capital expenditure was cut by about 70% year-on-year.

3.4 The 2013 and 2015 slope-collapse accidents

Two incidents that cannot be omitted when discussing the Philippine coal industry. Both occurred at the Panian pit.

Accident Date Details Deaths
Panian west-wall collapse February 13, 2013 A collapse of the western wall struck 13 workers on break. 3 escaped 5 confirmed dead + 5 missing (presumed dead) = 10 total
Panian north-wall collapse July 17, 2015 A rain-induced landslide collapsed the northern wall, burying workers and equipment under spoil and rock. Volume of collapsed material estimated at 374,000 m³ 9 dead (6 initially confirmed + 3 missing, with 7 recovered by July 20)

Government response: In the 2013 case, DOE ordered several weeks of suspended operations, then found no fault and permitted a full resumption in June 2013. In the 2015 case, DOE again ordered operations suspended for investigation. SMPC pledged ₱1 million per victim's family in support, plus scholarships and housing assistance.

Other fatal accidents have continued to be reported (September 2016: 3 drowned from gas inhalation inside a barge at the pier / October 2019: 1 death from a landslide at the Molave pit / July 2020: 1 death from a limestone rockfall near the Narra pit, and others).

注 Point of common confusion ④: SMPC's record includes both cases where it was found "not at fault" and cases where it faced suspension orders. Japanese-language articles that lump these together as "the company was sanctioned" are inaccurate.

3.5 The 2027 contract expiration and competitive bidding — 2026's biggest issue

This is the single most consequential, fast-moving issue as of 2026.

Timing Event
1977 COC No. 5 issued (originally 35 years). NDC (National Development Company) operated it for the first 13 years
— DOE extended it by 15 years, moving the expiration date from 2012 to July 14, 2027
December 2025 DOE said a decision would come "early next year"
February 2026 Based on DOJ (Department of Justice) advice, DOE ruled that "a renewal beyond 50 years is not possible" and moved to competitive bidding. Secretary Garin: "We don't want to just pick the lowest bidder — we want the most qualified operator"
February 2026 The 2026 PCECP (Philippine Conventional Energy Contracting Program) coal and pre-determined-area bidding round opened. 3 areas, 18 blocks, about 18,000 ha
March 2026 San Miguel Global Power and its subsidiary Sual Power attended a pre-bid conference. Meralco also purchased bid documents
May 2026 MGen (Meralco PowerGen) announced it would not bid. CEO Rubio: "There isn't enough time for due diligence" and "in a rational bid, the logical winner is still Semirara." Exploring minority participation in SMPC
July–August 2026 The bidding schedule has been repeatedly postponed. From a planned September timeline, it is now expected to slip by roughly another two months (Secretary Garin, August 2026)
August 10, 2026 SMPC announced it would cut its production target by more than a third from the previous annual level of 16–20 million tonnes, and lay off 462 workers (retrenchment notice filed with DOLE). 2026 capex also cut by about 70%
August 14, 2026 SMPC share price ₱18.44 (−7.8% week-on-week, from ₱20.00)

Reserves offered for bidding (government-stated)

Coverage Number of blocks Area Stated reserves
Semirara Island 10 About 10,000 ha About 160 million tonnes
3 areas combined (Semirara + Cagayan + Isabela) 18 About 18,000 ha About 207 million tonnes

注 These "160 million tonnes / 207 million tonnes" figures are estimates presented by DOE for the bidding process, and whether they comply with JORC or similar standards could not be confirmed in this research.

Secretary Garin said in August 2026 that "SMPC mainly exports its coal, and only a portion is for domestic power plants. Any shortfall can be met through domestic sourcing or imports," downplaying the risk of any temporary operational stoppage.


4. The paradox of "a coal-producing country that imports"

4.1 Why domestic coal isn't used domestically

Reason Details
Quality (rank) Most Philippine-produced coal is sub-bituminous and lignite. Low coal rank means low carbon content and low calorific value, with high moisture and ash content
Calorific value Semirara coal's calorific value is generally cited as 4,300–5,000 kcal/kg (as-received basis). 注 However, this is secondary information and could not be confirmed as SMPC's official product specification (unconfirmed). Contractually, the GAR/NAR distinction and tolerance bands (even ±50 kcal/kg can mean a large difference in value) need to be checked
Slagging/fouling Geochemical studies of the Panian coal seam (seam 32/33) found it rich in alkali and alkaline-earth elements, with medium-to-high slagging tendency and severe fouling tendency. This requires boiler-design changes or blending with Indonesian, Chinese, or Australian coal to mitigate
Boiler design Newly built supercritical units are often designed around high-calorific-value coal assumptions, and domestic coal alone cannot meet the designed heat input
Volume Mineable reserves are small and cannot cover demand (roughly 47 million tonnes a year, 2025 estimate)
Location/logistics The shipping distance from Indonesia is short, and it is also rational on price, low-sulfur, and low-ash grounds

In other words, imports serve not only to "fill a volume gap" but also as a blending material to meet quality specifications. Omitting this point makes the structure impossible to explain.

4.2 SMPC's export structure

Year Export destination breakdown
2021 China accounted for 95% of exports
2022 China 75% (reflecting China's own increased production and the Ukraine crisis)
2023 China 65%, South Korea 27%, Brunei 4%, remainder to Japan, India, Vietnam
2024 Exports of 8.4 million tonnes (+4%), of which China took 7.6 million tonnes (+46%) — about 90% of exports
2025 First shipment to Indonesia. Overall shipments fell amid softer demand for low-calorific-value coal

Of 2024 sales of 16.5 million tonnes, the breakdown was roughly 8.0 million tonnes domestic / 8.4 million tonnes exports (about 48:52). Most domestic sales went to SMPC's own Calaca power plants (SCPC, SLPGC) and to cement plants (of which 20% went to affiliate Cemex Holdings Philippines).

注 Point of common confusion ⑤: Writing only "the Philippines imports coal" is a half-truth. In reality, both imports and exports are large. The country's largest domestic producer exports to China while domestic power plants import from Indonesia.


5. Coal-fired power and the moratorium

5.1 The content of the 2020 moratorium

Item Details
Announcement October 2020, by Secretary Cusi at Singapore International Energy Week
Effective October 27, 2020. Formalized in a memorandum dated December 22, 2020
Content DOE would no longer process endorsement applications for greenfield (newly sited) coal-fired power plants
Exemptions ① Currently operating coal plants, ② projects with confirmed expansion plans and land at existing power-plant complexes, ③ "projects with substantial progress" — notarized land acquisition/lease agreements plus LGU permits and resolutions, ④ projects holding an Environmental Compliance Certificate (ECC) and LGU permits
Impact Of a roughly 12 GW pipeline, about 9.6 GW of greenfield projects were reported shelved

5.2 Effectiveness — the loopholes widen (2025–2026)

Timing Event
Late October 2020 Just three days after the moratorium was announced, DOE opened bidding for two coal blocks in Zamboanga Sibugay (upstream exploration was not covered by the moratorium)
July 2025 Secretary Garin (just after taking office) reinstated the moratorium exemption for Atimonan One Energy (A1E, Atimonan, Quezon, 1,200 MW, Meralco-affiliated), which DENR Secretary Lotilla had previously revoked. No public hearing was held. Environmental groups, church-affiliated groups, and consumer groups objected
October 14, 2025 A DOE circular (signed by Secretary Garin, following direction from the Office of the President) formally codified the following exemptions:
• Own-use generation / industrial estates (PEZA endorsement required if PEZA-registered)
• Off-grid projects
• Self-generation for mining and smelting of critical minerals essential to the energy transition
• New on-grid capacity is permitted only under exceptional circumstances, such as "a declared or imminent power crisis, or an imminent supply shortfall"
• Plants holding non-coverage certificates must submit a time-bound transition plan, retiring or converting to clean fuels by December 31, 2060
April 2026 NEDA/DEPDev Secretary Balisacan proposed lifting the moratorium. PCCI (Philippine Chamber of Commerce and Industry) also supported lifting it. Secretary Garin left the door open: "In times of crisis, coal remains one of the cheapest options"
May 2026 DOE stated clearly that "the moratorium remains in effect and will not be lifted." Secretary Garin: "We have already issued sufficient permits; there is no need to allow additional coal plants." The policy shifted toward encouraging the early completion of already-approved projects

Conclusion: The moratorium is a policy of "no new permits," not a policy to reduce coal-fired power. Projects approved as of 2020 (estimated by DOE at up to about 20 GW-equivalent) continue to move forward, and the October 2025 circular formally expanded the categories of exemption. Gerry Arances, executive director of CEED (Center for Energy, Ecology, and Development), has criticized this, saying "every time an exemption is added, DOE undermines its own policy goal," and Manila Bulletin (October 2025) described it as "the quiet burial of the moratorium policy."


6. Why the Philippines can't move away from coal

Factor Details / figures
Long-term bilateral contract (PSA) lock-in TransitionZero's analysis finds 109 new coal PSAs signed since 2024, totaling about 2.6 GW, covering 54 distribution utilities (DUs). Average remaining term about 10 years, up to 15 years at the longest. Because these contracts guarantee offtake, coal plants "burn coal to fulfill their contracts"
Minimum operation / minimum offtake obligations Model analysis sets a minimum operating rate of 15% or more for coal, geothermal, and gas (reflecting baseload behavior and minimum offtake obligations). Under high-fuel-price scenarios, coal and gas are pushed down to their contract floors, with an estimated 37 TWh becoming stranded
Determinant of spot prices On WESM, coal plants often act as the marginal unit setting the market clearing price. Coal is both the mainstay of bilateral contracts and a major influence on spot prices
The baseload argument Aboitiz Power argues that "the physical consequences of phasing out coal without a workable and affordable baseload alternative must be considered," while Meralco PowerGen positions LNG as a bridge fuel, saying "renewables alone cannot meet continuously growing demand"
Counter-argument At the 2025 Philippine Energy Transition Dialogue, critics asked "why allocate baseload capacity to peak demand? What's needed is flexible, dispatchable power." TransitionZero points out that frequent forced outages are undermining coal's reliability as baseload
Concentration of ownership A PCIJ investigation found that two major conglomerates control about half of domestic supply. San Miguel Global Power's capacity is over 60% coal (2024 annual report), and 48% of Aboitiz's net saleable capacity is coal (as of May 2025). Both companies derive over 75% of total capacity from fossil fuels

Grid strain (a 2026 case)

On May 13, 2026, NGCP declared the first Red Alert of 2026 across both the Luzon and Visayas grids.

Date Luzon grid
May 13 Available capacity 12,447 MW vs. projected peak demand 12,537 MW. Red Alert 15:00–20:00
May 14 Available capacity about 12,479 MW vs. about 12,595 MW
May 15 Available capacity 13,508 MW vs. 13,881 MW (a shortfall of 373 MW). 4,106 MW unavailable, with 16 units on forced outage since May, some of which had been down since 2019

Rolling blackouts hit over 200,000 Meralco customers (averaging about 3 hours). DOE and ERC ordered NGCP to submit an incident report. This grid strain directly fueled the debate over revisiting the coal moratorium.


7. Decarbonization pressure and the Energy Transition Mechanism (ETM)

7.1 What is the ETM?

The Energy Transition Mechanism (ETM) is a public-private initiative launched by the ADB (Asian Development Bank) in 2021. It uses blended finance combining concessional loans, equity, and guarantees, structured around two funds: ① a fund for the early retirement and repurposing of coal-fired plants, and ② a fund for new investment in clean energy. Partnerships have been established with the ADB, Indonesia, and the Philippines.

7.2 The SLTEC case (the world's first ETM transaction)

Item Details
Target South Luzon Thermal Energy Corporation (SLTEC), Calaca, Batangas, 246 MW
Execution In November 2022, ACEN (the Ayala Group's energy company) fully divested SLTEC using the ETM. The world's first ETM transaction
Mechanism Transfer of the business to an SPV. GSIS invested ₱2.2 billion in redeemable preferred shares, and InLife invested ₱1 billion, as anchor equity investors
Effect The plant's operating life of up to 50 years was cut in half, with retirement or conversion to clean technology by 2040. Up to 50 million tonnes of CO2 to be avoided/reduced
Use of proceeds 100% of ACEN's net proceeds were allocated to renewable energy investment
Bringing the date forward to 2030 At COP28, ACEN and CCCI (Coal to Clean Credit Initiative) announced they were exploring a "10-year acceleration (to 2030)" pilot using Transition Credits. In August 2024, ACEN, GenZero, and Keppel Ltd. signed an MOU. Since 2023, a methodology for calculating avoided emissions has been under development with MAS (Monetary Authority of Singapore) and the Rockefeller Foundation
Status as of 2026 RMI's analysis (February 2026) finds that, given the schedule for methodology revision, project design, and commercial implementation, "retirement by 2030 remains possible" — but no more than that. Financial viability requires comparing lost cash flow, decommissioning costs, contract-termination costs, and the additional cost of replacement clean power against a 2040 baseline

Caution: The legally binding commitment remains 2040. 2030 is a conditional aspirational target — "if transition credits become commercially viable." Many Japanese-language articles conflate the two.

7.3 STEAG Mindanao (a government-owned asset)

Item Details
Target Mindanao Coal-Fired Power Plant (Misamis Oriental), 210 MW, commissioned 2006, operated by STEAG State Power Inc. (SPI)
Reason selected According to ADB, because it is "the only asset owned by the Philippine government"
Contract A BOT (build-operate-transfer) arrangement running through 2031. Upon expiration, it transfers to PSALM, with 15 years of remaining operating life
Retirement option PSALM can terminate the BOT early starting in 2026, upon payment of an agreed termination fee
Funding The CIF (Climate Investment Funds) board approved US$500 million for the Philippines' ACT (Accelerating Coal Transition) investment plan, targeting the early retirement of up to 900 MW of coal capacity by 2027 and 1,500 MW of additional renewable capacity by 2030
Delay factor In February 2025, then-Secretary Lotilla said the plan might need to be reconsidered "to fill the supply gap during the long-term rehabilitation of the Agus and Pulangi hydropower plants"
As of September 2025 DOE's Director Sinocruz said "it has been finalized as an ETM target, but the mechanism and timing are still under discussion." ADB says it is in "continued discussions" with PSALM
Ownership AboitizPower acquired 69.4% of SPI in 2022, rising to about 85% in February 2024

注 No information confirming that a transaction was concluded in 2026 could be found in this research. The 2026 early-retirement target has, in effect, slipped.

Criticism: urgewald has pointed to structural flaws in how the ETM operates in practice, including "a lack of transparency, incentives skewed toward the private sector, and a failure to integrate fairness and local participation."


8. Coal prices and their pass-through to electricity rates, 2025–2026

8.1 Coal benchmark prices

Benchmark 2024 average 2025 average As of August 2026
Newcastle Index (Australia, 6,000 kcal grade) US$135.2/t US$105.6/t (−22%) About US$130/t (monthly range US$127.50–130.90, average US$129.65). 52-week range US$100.70–152.25, up about +13% year-on-year
ICI-4 (Indonesian coal index, 4,200 kcal GAR) US$53.9/t US$46.1/t (−15%) —
HBA (Indonesian government reference price, 6,322 kcal GAR) — 2nd period of June 2025: US$98.61/t (down −19.8% from US$123/t in the same month the year before) 1st period of August 2026: US$124.44/t (down −5.62% from US$131.85 in the 2nd period of July; up +21% year-on-year from US$102.22)
HBA, lower-calorific bands — — Late August 2026: 5,300 kcal grade US$96.92/t; 4,100 kcal grade US$65.81/t

(2024 and 2025 averages from SMPC's PSE disclosures. 2026 figures from Trading Economics / ESDM announcements as reported in the press)

Drivers of 2026 price movements: In Q2, the Iran-US clash, Strait of Hormuz risk, and Indonesian export restrictions drove Newcastle prices to their highest level in years; a provisional agreement in June eased tensions and prices fell to a four-month low, before Indonesian supply disruptions in late July (low water on the Barito River disrupting barge transport, with some mines declaring force majeure) pushed prices back up to US$130–136/t. In August, prices were roughly flat around US$130 amid factors including India's increased production (July coal output of 69.75 million tonnes, up +7.51% year-on-year).

注 Point of common confusion ⑥: HBA is a lagging indicator based on shipments from a month earlier (used for royalty calculations) and does not match the spot price. When writing about "the price of Indonesian coal," always specify whether it's HBA, ICI, or an FOB spot price.

8.2 Pass-through to electricity rates (Meralco, 2026)

Month Generation charge (₱/kWh) Overall residential rate (₱/kWh)
March 2026 7.8607 (+0.2209) 13.8161
April 2026 8.3864 (+0.5257) 14.3496
May 2026 8.7942 14.3345
June 2026 9.0704 (+0.2762) 14.4833
July 2026 9.2504 (+0.1800) 14.8261 (+0.3428)

Key upward drivers (per Meralco) - The prolonged impact of Middle East tensions on the global energy market (the PSA component contributed +₱0.2678/kWh, reaching ₱8.8694/kWh) - A weaker peso: April's +₱0.5257 was mainly due to a weaker peso (the applicable exchange rate for the March supply month rose more than ₱3 to ₱60.748). 99% of First Gas / Prime CoreGen's costs are dollar-denominated - WESM spot: On May 28, 2026, Luzon demand hit a record high of 14,534 MW, pushing the spot price to ₱8.0337/kWh. The secondary price cap was triggered in 11.1% of all hours - Meralco's power mix: First Gas/Prime CoreGen 22%, PSA 72%, WESM 6%

注 The factors Meralco cites for 2026 are centered on gas (LNG), a weaker peso, and spot prices, and it has not singled out "rising coal prices" as an independent driver. Coal costs pass through with a time lag via bilateral PSAs, so movements in coal indices do not show up in rates immediately.


9. Coal excise tax

9.1 Current level

The trajectory of the coal excise tax under the TRAIN Law (Republic Act No. 10963).

Period Tax rate (per metric tonne)
From 1976 Domestic coal exempt
1988–2017 ₱10
2018 ₱50
2019 ₱100
2020–present (current rate) ₱150

9.2 The 2026 debate

Actor Position
OECD (OECD Economic Surveys: Philippines 2026, February 2026) "While coal remains the mainstay of power generation, the low excise tax undermines the incentive to shift to clean energy," and "the moratorium is insufficient because it cannot prevent expansion through existing facilities." Recommends a full halt to coal expansion, accelerating early retirement of existing coal plants, and raising the coal excise tax while aligning energy taxation with CO2 content. Presented alongside fiscal-consolidation measures such as phasing out VAT exemptions
The Philippine Congress The main bill in progress is not a carbon tax but an emissions trading system (ETS). HB 6407 and HB 6890 (covering international carbon markets, allowance allocation, financial institutions, and tax incentives), and HB 2481 (closer to a conventional carbon tax framework). The 19th Congress also had a low-carbon economy bill (HB 11375). The House adjourned on June 3, 2026
WWF Philippines Argues that raising excise taxes on coal and natural gas could double government revenue from 0.25% to 0.50% of GDP, and that direct taxation is lower-cost than creating a cap-and-trade system
CPBRD (Congressional Policy and Budget Research Department) Argues that a carbon tax would require aligning it with the existing excise tax, VAT, import duties, and franchise tax, requiring sweeping reform of multiple tax regimes. Takes a negative view, stating that "in the Philippine context, the costs would significantly outweigh the benefits"

Conclusion: As of August 2026, raising the coal excise tax remains at the stage of an external OECD recommendation and cannot be confirmed as a government-sponsored bill.


10. Summary of unconfirmed points and cautions

# Matter Status
1 SMPC's latest JORC/NI 43-101-compliant resource and reserve statement Unconfirmed. The only confirmable material is the 2004 Minarco Asia Pacific review and the mention of JORC-standard confirmatory drilling in 2006
2 The reporting standard behind the bidding-round figures of "160 million tonnes / 207 million tonnes" Unconfirmed (government-stated figures)
3 Semirara coal's official product specification (calorific value, ash content, sulfur content, GAR/NAR) Unconfirmed. "4,300–5,000 kcal/kg (as-received basis)" is secondary information
4 Full-year 2025 coal import volume (DOE confirmed figure) Unconfirmed. The latest confirmed figure remains 39.872 million tonnes for 2024
5 The confirmed schedule and concluded transaction for STEAG Mindanao's early ETM retirement Unconfirmed (as of August 2026, no binding termination date has been announced by PSALM)
6 The final schedule and winning bidder for the Semirara coal-block bidding round Unconfirmed (delayed as of August 2026)
7 Coal's share of power generation Ranges from 60% to 63% depending on the source. Discrepancies arise between DOE (total generation basis) and Ember/third parties (consumption basis)
8 "World's #X coal-dependent country" Ember states "8th in the world by generation share, 17th by absolute volume" (2023 data). Always specify the metric

11. Glossary of key terms

Term Original language Meaning
Coal Operating Contract Coal Operating Contract (COC) A title for coal development under PD 972. SMPC's is COC No. 5
PCECP Philippine Conventional Energy Contracting Program DOE's bidding program for conventional energy (coal, oil, gas) blocks
Environmental Compliance Certificate Environmental Compliance Certificate (ECC) Issued by DENR-EMB. Defines the ceiling on project scale
WESM Wholesale Electricity Spot Market The wholesale electricity spot market
PSA Power Supply Agreement A bilateral power supply contract between a generation company and a distribution utility. Requires ERC approval
PSALM Power Sector Assets and Liabilities Management Corp. The corporation managing the sale of former NPC assets and liabilities
EPIRA Electric Power Industry Reform Act (RA 9136) The 2001 Electric Power Industry Reform Act
ETM Energy Transition Mechanism An ADB-led financing mechanism for early coal retirement
Sub-bituminous coal sub-bituminous coal A low-rank, low-calorific-value coal type — the dominant type of Philippine-produced coal
GAR/NAR Gross/Net As Received Gross/net calorific value on an as-received basis. Differences in the contractual basis can lead to large differences in value

日本語の詳細版: 分野「鉱業・エネルギー資源」「フィリピンの石炭とエネルギー鉱物」(本サイト日本語版)。