Philippine information you can trace to its source 日本語JAEnglishENTagalogTL
Home › Mineral Resources › Rare Earths and Strategic Minerals in the Philippines — Expectations vs. Reality, and the Framework After EO 122

Rare Earths and Strategic Minerals in the Philippines — Expectations vs. Reality, and the Framework After EO 122

As of 2026-08-30 · Updated 2026-08-30 · Section: Mineral Resources · 日本語版

The Philippines is a "nickel powerhouse," but it is not a "rare earth (REE) powerhouse." The two are frequently confused. Centered on Executive Order No. 122, s. 2026 (EO 122), signed on 21 August 2026, this article separates what has actually been confirmed about the country's resources from what has not.


1. Conclusion up front

Issue Reality (as of 2026-08-24)
Does the Philippines have rare earth deposits? No economically viable deposit has been confirmed. Multiple academic "prospects" exist, but no JORC / NI 43-101-compliant resource report has been identified
Which rare-earth-group elements are actually produced Scandium (Sc) only — as a by-product of nickel HPAL processing, on the order of 7–8 t/year (USGS, MCS 2024)
Is black sand a rare earth resource? 注 No. Its main component is magnetite (iron ore). Rare earths (e.g., monazite) occur only as trace accessories
What did EO 122 change? It unified the national policy framework for critical minerals for the first time. It is an executive order, however, not an amendment to the Mining Act (RA 7942)
The mainstay remains Nickel, copper, gold, cobalt, and chromite. 2025 nickel ore exports: 55.08 million t (PSA)

2. 注 Before you read the numbers — "reserves," "resources," and "occurrence" are not the same thing

This is where misreadings happen most often in articles about subsurface resources, and Philippine press coverage is especially loose about the distinction.

Term English Meaning Who publishes the figure
埋蔵量 (maizōryō) reserves / ore reserves An amount proven to be economically extractable at current technology and prices Companies (JORC/NI 43-101-compliant reports), USGS
資源量 (shigenryō) mineral resources Geologically indicated to exist, but economic viability not yet proven. Three tiers: measured / indicated / inferred Company compliant reports
賦存量・潜在量 (fuzonryō/senzairyō) potential / occurrence / endowment Geologically "likely to be there." Weak quantitative backing Government (MGB), industry associations, investment-promotion materials

Nearly all the figures circulating about Philippine rare earths belong to the third tier — occurrence/geochemical anomaly. If a Japanese-language article uses the word "reserves," the first suspicion should be mistranslation or misuse.

注 How to treat the claim "the Nth most mineral-rich country in the world"


3. The reality of rare earths — how much has actually been confirmed

3.1 The state of academic knowledge

The peer-reviewed paper "The rare earth element (REE) potential of the Philippines" (Journal of Geochemical Exploration, 2022, vol. 242, 107082) remains the most systematic assessment to date. Its abstract is unambiguous: "no known economic REE deposits exist in the Philippines," while identifying bauxite, ion-adsorption clays, and nickel laterite as potential future sources.

Site Type ΣREE+Sc+Y (approx.)
Erawan Beach (northern Palawan) Beach sand (placer) ~600 ppm
Samar Island bauxite Karst bauxite ~500 ppm
El Nido (Palawan) Ion-adsorption clay ~300 ppm
Ombo Beach Beach sand ~300 ppm
Eastern Samar bauxite Bauxite ~200 ppm

(Source: Journal of Geochemical Exploration 2022, 242:107082. Acknowledges DOST-PNRI, MGB Regional Offices III/V/VIII, PNOC Exploration, and the LGUs of Ilocos Norte, Camarines Norte, and Palawan.)

3.2 Government-side surveys

Actor Content Period
DOST-PNRI (Philippine Nuclear Research Institute) Confirmed light-REE and yttrium anomalies across six districts in northern Palawan (Erawan, Kapoas, Roxas, Babuyan-Langogan, Tanatanaon-Taradungan, Itangil-Tanatanaon) 1992
DOST Funded multiple projects characterizing REE occurrence in various deposit types 2010s onward
DOST-PNRI et al. Study on REE leaching from phosphogypsum (2.1–3.2 million t generated annually) 2023 (published in Journal of Material Cycles and Waste Management)
MGB Marine Geological Survey Division Five-year survey of the Philippine Rise (formerly Benham Rise) and the Celebes Sea for placer deposits (gold, platinum, titanium, iron, scandium, etc.), manganese nodules, and seafloor hydrothermal sulfides From 2018
MGB / Office of the President Announced a national mineral mapping and inventory program (including critical minerals and rare earths), to begin in 2026 Stated by President Marcos at Mining Philippines 2025, October 2025

注 The Philippine Rise lies at a depth of 2,000–5,000 m. It was approved by the UN CLCS in April 2012 as an extended continental shelf under the law of the sea, but survey work remains at an early stage, with no prospect yet of commercial extraction. The area around the Benham Bank was also designated a marine resource reserve in 2018.

3.3 Scandium associated with nickel laterite — the sole actual track record

The only rare-earth-group element the Philippines can genuinely claim to be producing is scandium (Sc).

Item Content
Operator Taganito HPAL Nickel Corp. (THPAL, Surigao del Norte)
Ownership Sumitomo Metal Mining 62.5% / Nickel Asia 22.5% / Mitsui & Co. 15.0%
Nameplate capacity Nickel 30,000 t/year, cobalt 2,640 t/year (Ni-Co mixed sulfide); 30-year project life
Sc recovery began 2018 (pilot preceded it at Coral Bay Nickel, Rio Tuba, Palawan)
Planned capacity Scandium oxide equivalent to 7.5 t/year (announced by Sumitomo Metal Mining, April 2016)
Actual output 7–8 t/year (USGS, Mineral Commodity Summaries 2024)
First shipment on record 6,752 dry-kg of scandium oxalate in the first half of 2019. MGB recorded it as "a first in Philippine mining history"
Refining Intermediate product recovered in the Philippines; final scandium oxide conversion takes place at Sumitomo Metal Mining's Harima Works (Japan)
Global market size Global supply is roughly 15–20 t/year (USGS). Used mainly in Al-Sc alloys and solid oxide fuel cells

Three points stand out. 1. In a market where global supply is only 15–20 t/year, a single Philippine site accounts for 7–8 t, which is an enormous share by percentage — though the absolute volume, and the dollar value, remain small. 2. It is often cited politically as a model case of downstream value-addition, but final refining takes place in Japan. EO 122's call for "domestic value-addition" is, in this case, only half realized. 3. Most of the scandium is lost, precipitating with iron and aluminum during HPAL's neutralization step. That means the existing nickel residue (tailings) is itself a scandium resource, and research is advancing on it as a target for "technosphere mining" (Minerals Engineering, 2022, among others).

注 THPAL has also commercialized recovery of chromite as a by-product since 2021. By-product recovery is at the center of the Philippines' realistic "critical minerals" strategy.

3.4 Heavy mineral sands containing monazite and zircon


4. Executive Order No. 122 (EO 122, s. 2026)

4.1 Overview

Item Content
Signing date 21 August 2026 (publicly reported on 22 August)
Formal purpose To establish a "Unified National Policy Framework for Developing the Critical Minerals Industry," and to reorganize the Mining Industry Coordinating Council (MICC)
4 principles (1) State Ownership; (2) economic development through critical minerals; (3) environmental protection and social/cultural development; (4) policy stability and implementing machinery
Area covered "At least 9 million hectares of prospective areas" (MGB Director Larry Heradez)
Legal character 注 It is an executive order, not a statute. It changes administrative practice within the framework of the 1995 Mining Act (RA 7942)

4.2 Key provisions (as reported)

Area Content
Downstream development Board of Investments (BOI) incentives (under the CREATE Act) for investment in refining, battery manufacturing, and related industries. Grants domestic processors priority access to ore at fair market prices
Permitting Shortens permit processing to a maximum of 6 months. A fully digital "Virtual One-Stop Shop" to be built within 1 year
Idle claims A "Use It or Lose It" rule. Non-performing or idle mining rights are to be cancelled and returned to public mineral reservations
Government assets Accelerates privatization of government-held critical mineral assets
Exploration A national exploration program and mineral reservation plan led by DENR-MGB, with preliminary exploration in prospective areas
MICC Moves to co-chairmanship by the DENR Secretary and the Finance Secretary. Adds cabinet members, local government, and indigenous-peoples representatives. A comprehensive work plan is due within 90 days
International cooperation Directs the building of partnerships with foreign governments, financial institutions, and others

4.3 注 A caution about the list of covered mineral types

Press coverage (PTV News, Manila Bulletin, Philstar, GMA, and others) cites "lithium, copper, nickel, cobalt, graphite, and rare earths" as examples of critical minerals, but the existence and content of a definitive list of mineral types (an annex) attached to the text of EO 122 remains unconfirmed in the Official Gazette as of 2026-08-24. Any Japanese-language article that asserts "this is the Philippines' definitive critical minerals list" should have its source checked.

4.4 Assessment and criticism

Position Claim
Government / MGB "Shifting national strategy from raw ore exports toward an integrated processing ecosystem" (MGB Director Heradez)
Chamber of Mines of the Philippines (COMP) Strongly supportive of policy stability, regulatory consistency, and transparency
Mindanao Development Authority (MinDA) Expanded opportunities for mineral-resource regions, particularly Mindanao
Criticism ① (Congress) Deputy Minority Leader Antonio Tinio has criticized it as a "wholesale surrender," raising concerns over widescale displacement of farmers and indigenous peoples, accelerated privatization of government mining assets, and simplified permitting
Criticism ② (structural) Mining's contribution to GDP remains under 1% (0.51% in 2024, MGB). Structural factors that a policy framework alone cannot resolve remain in place (the highest electricity rate in Southeast Asia at ₱12.43/kWh, June 2026, DOE — 0.09 pesos above Singapore, inadequate infrastructure, conflicting local-government regulations, and community opposition) (corrected in a 2026-08-25 cross-check: the earlier wording, "among the highest electricity rates in Asia," was a superlative claim with no stated comparison scope, metric, or source. Source: field "Overview of Subsurface Resources" §9-1 / "Mining and Nickel" ch. 4 and 10 / field "Electricity and Power Rates")
Criticism ③ (implementation capacity) Climate Rights International points out that DENR/MGB is already unable to adequately monitor and regulate mining's environmental impact (February 2026)

Substantive assessment: EO 122 is "administrative groundwork to encourage exploration and attract processing investment"; it has neither discovered new rare earth deposits nor increased reserves. The 9-million-hectare figure refers to "prospective areas" — i.e., occurrence potential — not reserves.


5. The Philippines' critical minerals — by the numbers

Mineral Global standing Reserves/production (source, year)
Nickel 2nd in world production (9.5% of world total, USGS 2024) Reserves: 4.8 million t (nickel metal content, USGS). 注 Some reports cite "440 million t," which appears to refer to ore volume; take care not to confuse the units
Nickel ore exports ~95% of the world's ore exports (PNIA) 55.08 million t / $1.47 billion in 2025 (Philippine Statistics Authority, PSA, reported February 2026). 2024: 44.97 million t / $1.04 billion
Cobalt 7th in world production (1.0% of world total, USGS 2024) / 6th in world reserves 2025 production (est.): 3,700 t; reserves: 260,000 t (USGS)
Copper Main deposits in Luzon (Baguio, Mankayan, Kalinga, Abra, Nueva Vizcaya) and Mindanao H1 2025 production value: ₱13.71 billion (MGB)
Gold Since 2024, the largest mineral commodity by value, surpassing nickel 2024: 28,870 kg / ₱126.36 billion (MGB)
Chromite Declining trend Jan–Sep 2025: 72,599 DMT (−30.1% YoY, MGB)
Scandium 7–8 t of a global supply of 15–20 t/year THPAL (see above)
Rare earths (excl. Sc) Zero production; no compliant resource report exists Only academic reports of occurrence

Size of the industry as a whole (MGB) - 2024: Total mining production value (including non-metallic minerals): ₱316.29 billion; mineral exports approximately $7.38 billion. 注Metallic-minerals-only production value is cited as ₱252.9 billion (corrected in a 2026-08-25 cross-check: the earlier entry described ₱316.29 billion as "metallic minerals production value," but the five source documents within the cluster treat it as total mining production value. Source: field "Copper and Other Metal Resources" §2-2 / "Non-Metallic Minerals and Aggregates" §2.2 / "Mining and Nickel" ch. 1. MGB has not clearly stated the difference between the two definitions, and primary confirmation of the ₱252.9 billion figure remains incomplete = unconfirmed) - Jan–Sep 2025: production value ₱219.742 billion (+14.8% YoY) - Q1 2026: ₱82.78 billion (+28.6% YoY). Gold ₱53.78 billion, nickel DSO ₱10.69 billion - Operating mines: 60 metallic, 61 non-metallic. Employment: approximately 291,672. Mining-claim area: 787,279 ha (2.62% of national territory)

注 In June 2025, the bicameral conference committee deleted a provision that would have banned unprocessed nickel ore exports by 2030. It had been included in the Senate version (SB 2826, passed on third reading 3 February 2025), but was dropped due to strong industry opposition (electricity costs, infrastructure, and the fact that smelters cannot be built in five years). Consequently, the Philippines has no Indonesian-style ban on raw ore exports. EO 122's downstream push is incentive-driven, not a prohibition.


6. How the U.S., EU, Japan, and China view the Philippines

6.1 United States

Timing Item
4 February 2026 Signing of the U.S.-Philippines Critical Minerals and Rare Earths MOU in Washington, D.C. Signed by Philippine Secretary of Environment and Natural Resources Raphael Lotilla and U.S. Under Secretary of State for Economic Growth, Energy, and the Environment Jacob Helberg, at the U.S. State Department's "2026 Critical Minerals Ministerial" (54 countries plus the European Commission)
Same day 11 countries signed simultaneously alongside the Philippines (Argentina, the Cook Islands, Ecuador, Guinea, Morocco, Paraguay, Peru, the UAE, the UK, Uzbekistan, and the Philippines)
December 2025 Launch of Pax Silica, comprising the U.S., Australia, Israel, Japan, South Korea, Singapore, and the UK — 7 countries
16 April 2026 Joint U.S.-Philippine announcement of plans for a 4,000-acre Economic Security Zone in New Clark City, within the Luzon Economic Corridor — Pax Silica's first "AI-native industrial acceleration hub"
17 April 2026 The Philippines signed the Pax Silica declaration (Trade and Industry Undersecretary Ceferino Rodolfo). The U.S. intends to commit $250 million to the Pax Silica Fund
Feb–Mar 2026 Full Philippine participation in the U.S.-led critical minerals "trade bloc" remains under consideration on the Philippine side. DTI is pushing for participation in multilateral agreements

注 The MOU is not a legally binding procurement contract. Its content is a "framework" for promoting investment in processing, refining, and downstream manufacturing, technology transfer, and workforce development. Critics (economist Cielo Magno) note that "with mining taxes and royalties at the regional floor, the country has no bargaining leverage," while the scientist group AGHAM points out that there is "no guarantee of technology transfer."

6.2 EU

6.3 Japan

Point Content
Ore procurement 注 Surprisingly small. Nickel ore exports from the Philippines to Japan totaled 130,000 t / $4.86 million in 2025 (PSA) — an order of magnitude below China's 39.5 million t and Indonesia's 15.45 million t
Substantive involvement Not ore, but intermediate products. Sumitomo Metal Mining (Coral Bay, THPAL) with Mitsui & Co. secure Ni-Co mixed sulfide and scandium through HPAL
Policy The 7th Strategic Energy Plan (approved by Cabinet, February 2025) positions securing a stable supply of critical minerals as a priority. A Cabinet decision on 20 January 2026 allocated ¥39.0 billion from FY2025 reserve funds toward, among other things, additional JOGMEC investment as part of diversifying rare-earth supply chains
Pax Silica Japan has been one of the 7 founding members since its launch (December 2025)
注 Risk Nickel prices rose following February 2025 reports of a proposed Philippine raw-ore export ban (from $15,007.5/t in January to $16,460/t on 12 March, JOGMEC). The ban proposal was deleted in June of the same year, but could resurface as a policy risk

For Japanese companies, the Philippines functions less as an "ore supplier" than as a "production base for HPAL intermediate products and scandium." Missing this distinction risks misreading where Japan's actual interest lies.

注 That said, Sumitomo Metal Mining's Palawan operations (Coral Bay/Rio Tuba) received a joint petition in April 2025 from 86 organizations across 39 countries calling for a halt to operations over hexavalent chromium exceeding water-quality standards (Friends of the Earth Japan and others). Japanese corporate involvement is not free of controversy.

6.4 China

Item Figures/facts
Destination of nickel ore At least 92% of Philippine nickel ore shipments went to China from 2020 to 2024 (Climate Rights International & Empower, May 2025 study)
Dependence as seen from China China imported 34.5 million t of nickel ore in 2024, all of it Philippine-sourced — over 90% of China's total nickel ore imports (China Customs)
Change in 2025 China's share fell from 78% in 2024 to 66% in 2025 (PNIA), as shipments to Indonesia surged to 15.45 million t. 注This does not reconcile on a volume basis: calculating from the 2025 export breakdown in field "Mining and Nickel" ch. 4 (China 39.5 million t / total 55.08 million t) yields a China share of approximately 71.7%. PNIA's 66% figure may be value-based or refer to a different period, and remains unconfirmed. When citing a share figure, always specify whether it is volume- or value-based, and its source (annotated in a 2026-08-25 cross-check)
Capital Some Philippine mining companies have Chinese minority shareholders embedded in their structures (foreign ownership is capped at 40%). As of 2026, however, firms such as Tsingshan and Lygend are reportedly shifting their interest to Madagascar, New Caledonia, and Tanzania (PNIA)
Political factor PNIA notes (June 2026) that tension over the West Philippine Sea (South China Sea) is affecting Chinese companies' long-term investment decisions
Refining bottleneck 注 China controls over 90% of the world's extracted-gallium, graphite, manganese, and rare-earth refining (Manila Times editorial, 24 August 2026). Even if the Philippines pursues "de-risking from China," whether sufficient non-Chinese refining technology and capacity exist is a separate question

7. The black-sand mining problem

7.1 注 Getting the terminology straight first

7.2 The reality

Item Content/source
Production/export record 1.75 million t of magnetite produced from 2012–2014, all from an undersea mine off Cagayan province, all shipped to China, worth ₱2.263 billion / $41.6 million (MGB data, PCIJ reporting)
State of permitting 注 As of June 2022, the Environmental Management Bureau (EMB) reported only 4 magnetite-extraction operations nationwide holding an Environmental Compliance Certificate (ECC) — 3 in Cagayan, 1 in Camarines Norte. Zero in Ilocos Sur, where small-scale illegal mining has been documented, extending into Pangasinan
Mining rights 12 offshore magnetite MPSAs as of June 2022 (8 in Cagayan, 4 in Leyte)
Distribution Environmental groups have tallied 20 magnetite extraction sites across northern Luzon (Cagayan–Ilocos–Zambales); also reported in Leyte
Legal framework The 1995 Mining Act bans extraction within 500 m offshore and 200 m onshore of the mean low-water mark. 注 DENR oversees large-scale operations, but small-scale mining falls outside its jurisdiction — a regulatory gap
Enforcement A 2018 inter-agency fact-finding committee report identified magnetite extraction as the most common form of illegal mining, often conducted under the guise of "dredging" or "sand extraction"

7.3 The shift after 2022 — repackaged as "dredging"

PCIJ's investigative report of 16 June 2026 is the most recent and most detailed to date.

7.4 Damage

7.5 Legislative developments


8. 注 Points that are easy to get wrong

  1. Don't conflate rare earths with nickel. The Philippines is a critical-minerals country, but that means nickel, cobalt, copper, and gold — not rare earths.
  2. Black sand ≠ rare earths. Its main component is magnetite (iron), exported to China's steel industry.
  3. "9 million hectares" is prospective area, not reserves. Actual mining-claim area is 787,279 ha (2.62% of national territory).
  4. "5th most mineral-rich country in the world" is a claim based on density of occurrence per unit area; no standardized international index confirms it.
  5. EO 122 is not a statute. It is an administrative change within the 1995 Mining Act, and a future administration could rescind or amend it.
  6. There is no raw-ore export ban in the Philippines. It was deleted from the bill in June 2025; don't equate the country with Indonesia.
  7. Writing an optimistic case for rare earths without mentioning the monazite thorium problem will not be credible to practitioners.
  8. Final refining of scandium takes place in Japan (Sumitomo Metal Mining, Harima). It cannot simply be cited as "an example of downstream development succeeding in the Philippines."
  9. 注 No JORC/NI 43-101-compliant REE resource report can be confirmed as of 2026-08-24. Whenever you see a figure such as "X0,000 tons of resources," always check the reporting standard and who issued it.
  10. 注 Figures such as "the Philippine rare earth market is worth $X billion," published by commercial market-research firms, are often demand-side estimates unrelated to actual domestic production.

9. Checkpoints for the next 6–12 months

Timing What to watch
Around November 2026 The MICC's comprehensive work plan under EO 122 (due within 90 days of signing — around 19 November 2026)
Within 2026 Publication in the Official Gazette of the full text of EO 122 and the finalized definition of critical minerals / list of covered mineral types
2026 into 2027 Details of implementation (budget, methodology, coverage) of MGB's national mineral mapping and inventory program
Around August 2027 Launch of the permitting Virtual One-Stop Shop (within 1 year of the EO's signing)
Ongoing Concrete projects at the Pax Silica New Clark City Economic Security Zone (whether actual investment in refining and battery-making materializes)
Ongoing Deliberation of HB 1843-type black-sand ban bills, and the results of the presidentially ordered investigation into Cagayan dredged sand
Ongoing Whether the first JORC/NI 43-101-compliant report on Philippine REE ever appears (if it does, the picture changes)

日本語の詳細版: 分野「地下資源」「フィリピンのレアアースと戦略鉱物」(本サイト日本語版)。