Philippine information you can trace to its source 日本語JAEnglishENTagalogTL
Home › Mineral Resources › Major Gold Mines and Production in the Philippines

Major Gold Mines and Production in the Philippines

As of 2026-08-30 · Updated 2026-08-30 · Section: Mineral Resources · 日本語版


0. First, Don't Confuse Three Different "Quantities"

Most articles about Philippine gold use the following terms interchangeably. Getting this wrong leads to misreading everything else.

Term Definition Who Reports It Philippine Example
Ore Reserves / Mineral Reserves The portion of a resource proven to be "economically mineable," factoring in a mine plan, recovery rates, metal-price assumptions, and permits Listed companies, disclosed under the signature of a Competent/Qualified Person (CP/QP) Didipio: 41.5 Mt @ 0.85 g/t Au (contained gold 1.13 Moz, as of 31 December 2025, NI 43-101, OceanaGold)
Mineral Resources The volume of a mineralized zone shown geologically to be plausible; economic viability not yet proven. Split into Measured & Indicated (M&I) and Inferred Same Tampakan: 2.94 Bt @ 0.51% Cu, 0.19 g/t Au (JORC 2004, as of end-December 2011, SMI)
Endowment / In-Situ Value A rough government/industry estimate of "the total estimated value of minerals underground," including unexplored land Government PR, industry groups, media "US$1 trillion in undeveloped minerals" (government PR; an MGB official has himself acknowledged it as a "rough estimate," Manila Bulletin, 2019)

注 The claim "the Philippines has the world's 2nd-largest gold reserves" cannot be substantiated. - As a claim about the central bank's gold reserves, it is clearly wrong. Rappler's fact-check (published February 2023, using Q4 2022 World Gold Council/IMF data) found the Philippine central bank held 157.06 t against the United States' 8,133.46 t, ranking the Philippines around 26th in the world, and rated the claim "False." FactRakers had already debunked a 2020 version of the same claim. (Corrected 2026-08-25 during cross-referencing. The earlier note "2022" referred to the reference point of the cited data, not the publication date. Source: field "Gold Reserves and Deposits," section 2-1, "Rappler ruled False in February 2023") - As a claim about underground reserves, "2nd in the world" traces only to Forbes (2015) and Gulf News citing no source, and cannot be traced back to a primary source from the USGS or any geological survey body. This material treats it as an unconfirmed, source-unclear claim in wide circulation.

注 Differences in reporting standards must also always be checked. - PMRC 2020 (Philippine Mineral Reporting Code) = the domestic disclosure standard for PSE-listed companies. OceanaGold Philippines used this standard for its March 2026 mine-life extension disclosure. - NI 43-101 (Canada) = used by parent companies listed on the TSX, such as OceanaGold and B2Gold. - JORC (Australia) = used by SMI (Tampakan), X64 Gold (Co-O), and others. - MGB production statistics are government administrative statistics, not a reporting standard — they carry no guarantee regarding reserves.


1. National Gold Production and World Ranking

1-1. Production trend (based on MGB — Mines and Geosciences Bureau — data)

Year Gold Production Production Value Notes
2022 29,036 kg ₱91.05 bn
2023 31,046 kg (+7%) ₱106.64 bn (42.82% of total metal value)
2024 28,870 kg (≈928,000 oz) ₱126.36 bn Gold became the No. 1 mineral commodity, overtaking nickel (MGB statistics cited in Chambers' "Mining 2026 – Philippines")
Jan–Sep 2025 20,500 kg (vs. 21,651 kg in the same period the prior year, ▲5.3%) ₱117.421 bn (+28.9%) MGB provisional figure (Philippine Resources Journal, December 2025)
Jan–Mar 2026 Volume unconfirmed Mining production value +28.6% MGB (Context.ph, 2 June 2026)

A consistent pattern since 2024: volume down, value up. Combined metallic mineral production value for Jan–Sep 2025 was ₱219.742 bn (+14.8%), of which gold's ₱117.4 bn accounted for nearly half.

注 MGB statistics are revised from provisional to final figures. Gold production for Jan–Sep 2024 was initially reported as 22,034 kg and later revised to 21,651 kg. The figure for the same period can differ depending on when it was referenced, so always note "as reported by MGB in [month/year]." Similarly, metallic mineral production value for H1 2025 is given as both ₱135.62 bn (MGB's H1 review) and ₱140 bn (as cited by Chambers) — the two figures don't match.

注 As of the time of writing (2026-08-24), MGB's confirmed full-year statistics for 2025 could not be confirmed (unconfirmed). Full-year figures are typically published between March and June of the following year.

1-2. World ranking


2. The Ratio of Large-Scale Mining to Small-Scale Mining

Category Legal Basis Scale Distribution Route
Large-scale (gold mines) Philippine Mining Act (RA 7942, 1995), MPSA/FTAA 11 operating gold mines (as of June 2025, MGB; 12 as of June 2024) Refined overseas (e.g., Heraeus, Hong Kong)/exported, some to the BSP
Small-scale (ASGM) Small-Scale Mining Act (RA 7076, 1991) + DAO 2015-03 63 declared Minahang Bayan sites (of which 50 gold, 11 chromite, 1 magnesite, 1 silica quartz) (as of 14 March 2025 — MGB "Minerals Industry at a Glance." Corrected 2026-08-25 during cross-referencing; the earlier note of "June 2025" was incorrect. Source: field "Gold Reserves and Deposits," section 9/"Gold Institutions, Taxation, and BSP," section 6). 注 A separate tally puts the figure at 53 as of July 2025, so both numbers circulate. Estimated 200,000–500,000 workers In principle, only the BSP (Bangko Sentral ng Pilipinas) may legally buy and export

Figures commonly cited for the ratio: - PIDS (Philippine Institute for Development Studies) research: about 70% of domestic gold supply originates from small-scale mining. - DENR-EMB (2011): 80% of annual gold production is ASGM, with about 500,000 miners.

注 A precise "large-scale : small-scale" ratio cannot institutionally be produced. MGB statistics center on declared figures from large-scale mines, while a substantial share of small-scale gold output goes uncaptured through smuggling and non-declaration. When a 2% excise tax plus 5% withholding tax was imposed on small-scale miners' sales to BSP in 2011, BSP purchases collapsed from over 900,000 troy ounces in 2010 to only about 10,000 troy ounces by 2019, and Reuters reported that "as much as 90% of small-scale gold production is smuggled, primarily to China." RA 11256 (2019) restored the tax exemption, but the statistical gap remains.

2025–2026 developments: - BSP operates buying stations in Quezon City, Baguio, Naga, Zamboanga, and Davao, requiring LBMA Responsible Gold Guidance (RGG) documentation. - The pawnshop chain Cebuana Lhuillier (about 3,500 branches nationwide) is being brought on board as an accredited gold trader. - MGB is rolling out MOSS (Mobile One-Stop Shop) across mining regions to simplify registration for small-scale miners and their connection to BSP (2026). - Large-scale miners are also obligated to sell to BSP. OceanaGold Philippines sold 6,684 oz to BSP in 2025, exceeding its minimum commitment of 25% (for March 2025–March 2028). 注Caution regarding "31% of annual production": Didipio's total 2025 gold production was 90,700 oz, of which 6,684 oz is only 7.4%. The 31% figure refers to the share of doré gold production, not total gold production (the remainder is exported embedded in copper concentrate). Confusing this with total gold production leads to an order-of-magnitude error (noted 2026-08-25 during cross-referencing; the same "roughly 31% of annual production" phrasing also appears in field "Mining and Nickel," section 6, and "Small-Scale Gold Mining and Mercury Issues," section 9).


3. Major Operating Gold Mines

3-1. Masbate Gold Project — the country's largest gold-producing mine

Item Detail
Location Aroroy, Masbate Island
Operators Filminera Resources Corp. (holds the tenement; B2Gold 40%/Zoom 60%) + Philippine Gold Processing & Refining Corp. (PGPRC) (100% B2Gold; purchases and processes ore)
Parent company B2Gold Corp. (TSX/NYSE American: BTO/BTG, Canada)
Method Open-pit mining plus low-grade stockpile processing

Production performance and plans (B2Gold disclosure)

Period Gold Production Notes
Full-year 2025 196,526 oz Original guidance of 170,000–190,000 oz was raised to 190,000–210,000 oz in September 2025 and achieved
Q1 2025 46,369 oz Grade 0.83 g/t, throughput 2.28 Mt, recovery 75.9%
Q2 2025 50,738 oz Grade 0.93 g/t, cash operating cost US$801/oz
Q3 2025 49,519 oz Recovery 80.0%
2026 guidance Originally 170,000–190,000 oz → raised in the Q2 earnings release (6 August 2026). Mine-level guidance is now 180,000–200,000 oz. 注However, as of 2026-08-25, B2Gold's official website for Masbate still shows "170–190 koz." Whether the upward revision applies, and at what level (consolidated or mine-specific), is unconfirmed — needs re-verification (noted 2026-08-25 during cross-referencing) Assumes throughput of 8.2 Mt, grade 0.93 g/t. AISC US$1,430–1,580/oz, cash operating cost US$900–1,000/oz (B2Gold official site, confirmed 2026-08-25)

Reserves (latest, as of 31 December 2025, NI 43-101, at a gold price assumption of US$2,000/oz): total 62.9 Mt @ 0.72 g/t = 1.46 Moz (all Probable; no Proven category). Breakdown: North 6.6 Mt @ 0.79 g/t = 170 koz / South 17.3 Mt @ 1.00 g/t = 560 koz / Stockpile 39.0 Mt @ 0.59 g/t = 740 koz. Half of the contained gold is already low-grade material that has been mined and stockpiled. Resources: Indicated 140.9 Mt @ 0.70 g/t = 3.18 Moz / Inferred 40.16 Mt @ 0.72 g/t = 0.93 Moz (resource effective date is 31 March 2026). (Corrected 2026-08-25 during cross-referencing. The earlier entry had primarily cited figures from one year earlier, as of 31 December 2024 — 61,000 kt @ 0.73 g/t = 1,430 koz, at a US$1,750/oz price assumption. That prior-year figure is retained for reference, but the figures above are current. Source: confirmed directly from B2Gold's official Masbate Gold Project webpage on 2026-08-25. Field "Gold Reserves and Deposits," Chapter 6, also states 62.9 Mt @ 0.72 g/t = 1.46 Moz as of 31 December 2025, consistent with the above) Open-pit mining is scheduled to end in 2028, with the mill continuing to process stockpiled ore through 2034 — this "long tail" is a defining feature of Masbate's asset profile. It paid over ₱10 billion in national and local taxes in 2025, and its host municipality of Aroroy was upgraded from a 4th-class to a 1st-class municipality (B2Gold/Manila Times, July 2026).

3-2. Didipio Mine — the country's first FTAA project, gold plus copper

Item Detail
Location Straddles Kasibu, Nueva Vizcaya, and Quirino Province
Operator OceanaGold (Philippines), Inc. (OGPI/PSE: OGP). 80% owned by parent company OceanaGold Corp. (TSX: OGC)
Title FTAA (Financial or Technical Assistance Agreement). Originally signed June 1994 → renewed for 25 years from 19 June 2019 (through 2044); formal grant issued July 2021
Revenue split 60% government : 40% company (on a net-revenue basis)

The 2019–2021 suspension and restart: after the FTAA expired in June 2019, renewal stalled, and the provincial governor blocked ore- and materials-hauling trucks; by 2020, 80% of employees had been laid off. In July 2021, the Duterte administration formally granted the renewal and operations resumed. 注 The renewal remains under litigation. It was challenged in the Nueva Vizcaya Regional Trial Court on grounds of lacking prior community consultation; a 2 April 2025 partial ruling ordered pre-trial proceedings on a continuing mandamus while dismissing the petition for certiorari, holding that the renewal was "merely an extension of the original FTAA's term."

Financial and production performance

Period Gold Copper Financials
2024 97,000 oz ~12,300 t Net profit $30.3 m
2025 90,700 oz 13,300 t (+8%) Net profit $76.5 m, revenue $438.8 m (+28%), realized gold price $3,494/oz (all-time high)
2026 guidance 85,000–105,000 oz 13,000–15,000 t Exploration spend $10 m
Jan–Jun 2026 41,800 oz (▲7%) 5,900 t (▲17%) Net profit $67.4 m (+206%), revenue $285.3 m, realized gold price $4,073/oz, AISC $1,436/oz, FCF $62.3 m

Reserves and resources (as of 31 December 2025, NI 43-101, assuming Au $2,200/oz and Cu $4.00/lb) - Reserves (Proven + Probable): 41.5 Mt @ 0.85 g/t Au, 0.32% Cu → contained gold 1.13 Moz / contained copper 0.13 Mt - Resources (M&I): 45.2 Mt @ 0.92 g/t Au, 0.35% Cu → gold 1.34 Moz / copper 0.16 Mt - Resources (Inferred): 9.2 Mt @ 0.9 g/t Au, 0.3% Cu → gold 0.3 Moz

The biggest 2026 news: in March 2026, an updated PMRC 2020-compliant mine plan was disclosed to the PSE, extending the mine life from 2035 to 2037 (using a conservative gold price assumption of $2,200/oz). This was followed by OceanaGold's announcement in July 2026, timed to President Marcos's Vancouver visit, of a total investment of US$1.9 billion (some reports cite US$1.96 billion), creating roughly 2,500 direct and indirect jobs. It is being watched as the first major investment decision made under the Philippines' new fiscal regime (RA 12253). Listing: because the FTAA mandates a PSE listing, OGPI listed on 13 May 2024, offering 20% of its shares (₱13.33/share, 456 million shares, about ₱6.08 billion) — the first mining company IPO since 2012. Local business taxes for 2025 totaled ₱397.7 million across three municipalities, with Kasibu receiving the largest share at ₱198.9 million.

3-3. Padcal Mine — the 2012 tailings dam collapse and closure planned for 2028

Item Detail
Location Itogon/Tuba, Benguet Province
Operator Philex Mining Corp. (PSE: PX) (First Pacific/MVP Group)
Started operations 1958 (about 68 years of operation as of 2026)

The August 2012 tailings dam collapse (the country's largest mining disaster) - Heavy rain from typhoons Gener and Ferdie caused Tailings Pond No. 3 to breach, releasing 20.69 million tons of tailings into the Balog and Agno river systems. - Citing the ₱50-per-ton provision of the Mining Act (1995), MGB imposed a fine of ₱1,034,358,971 (about ₱1.03 billion). Philex argued force majeure — that rainfall of 331.80 mm exceeded the 50-year design storm of 234.50 mm — but its appeal was rejected in November 2012, its request for installment payments was also denied, and it paid the fine in full on 18 February 2013. - In June 2014, it paid an additional ₱188.6 million for violations of the Clean Water Act. Philex stated total related costs came to approximately ₱4 billion. - 注 Claims that "Philex never paid, or had the fine reduced" are incorrect. The fine was paid in full.

Recent production and closure

Year Gold Copper Milled
2024 30,702 oz 19.780 M lb 6.809 Mt
2025 24,358 oz 18.155 M lb 6.774 Mt
Q2 2026 4,011 oz (+80% QoQ) 3.388 M lb (+81%) 1.56 Mt (+68%)

Full-year 2025 core net income was ₱1.071 billion, on revenue of ₱8.854 billion. Q4's realized gold price of $4,338/oz was an all-time high — a textbook example of price fully offsetting a decline in volume. Early 2026 saw reduced output due to damage to the secondary and tertiary crushing plants (Q1 milled 931,000 tons), recovering after repairs in Q2. Closure is planned for 2028. However, confirmatory drilling of an ore body identified in the 1980s has been completed and resource evaluation is underway; an initial extension-feasibility study is expected at the end of 2026 (Philex).

3-4. Siana Gold Project — suspended since a 2024 TSF collapse

3-5. Co-O Mine — 注 watch for the frequent mistaken attribution of the operator

注注 The Co-O Mine is not operated by Benguet Corp or Apex Mining. This error appears frequently in Japanese-language articles.

3-6. Maco Mine (Apex Mining) — the flagship gold stock on the PSE

Period Gold Sold Silver Sold Realized Gold Price Net Profit
Jan–Jun 2025 51,436 oz 197,925 oz $3,121/oz ₱3.20 bn (+70%)
Jan–Sep 2025 — — — ₱5.45 bn (+77.5%), revenue ₱15.48 bn
Jan–Jun 2026 43,215 oz (▲16%) 154,946 oz (▲22%) $4,656/oz (+49%) ₱5.39 bn (+68%), revenue ₱12.84 bn (+35%)

In H1 2026, both gold and silver sales volumes fell, yet profit rose by nearly 70% (the realized silver price rose +134% to $77.67/oz). Throughput increased 18% to 542,697 t, but grade declined as mining moved into deeper, higher-grade zones (which have yet to be fully accessed). Based on 2025 resource and reserve statements, the mine has reserves sufficient for operations through 2034 at a throughput of 3,000 t/d. Work to expand processing capacity to 3,500 t/d is targeted for completion by the end of 2026. The Tagbaros drainage/ventilation tunnel is providing access to deeper ore bodies. A copper project tied to the acquisition of Asia Alliance Mining Resources — including construction of a processing plant — represents an investment of about US$300 million. Apex was named to Forbes Asia's "Best Under a Billion" list (2026) for the second time.

3-7. Benguet Corporation's Mines

3-8. Other Operating Mines Worth Knowing

Mine Province Operator (Listing) 2025–2026 Highlights
Runruno Nueva Vizcaya Metals Exploration Plc (UK AIM) 2025 was a record year, with gold sales of $208.4 m, pre-tax free cash flow of $115.3 m, and a Q4 realized price of $3,995/oz. Mining is set to end in Q3 2026 due to ore depletion, with processing to conclude by end-2026/early 2027. 2026 guidance was cut from 50,000–60,000 oz to 40,000–48,000 oz (due to BIOX circuit issues, declining grades, and legacy illegal-mining impacts). Cash flow is being redirected to the next project, La India, in Nicaragua
Victoria/Teresa Benguet (Mankayan) Lepanto Consolidated Mining (PSE: LC/LCB) H1 2026 net profit more than doubled to ₱1.59 bn, revenue ₱3.24 bn (+47%). Gold 10,931 oz (▲7%), silver 21,518 oz (▲9.2%), realized gold price $4,684.40/oz. MPSA 001 (948.47 ha) expired in March 2025. The Supreme Court required FPIC to proceed first → most residents voted in favor in February 2026 → a 25-year MOA with the indigenous community was signed on 30 July 2026. Awaiting the NCIP's Certificate Precondition. The related Far Southeast project (FSGRI 60%-owned) remains undeveloped; an option agreement with Gold Fields was terminated in July 2024
Balabag Zamboanga del Sur (Bayog) 100% TVIRD (30.66% TVI Pacific) Commercial production began 2021, open-pit mining with a hybrid Merrill-Crowe/CIL process at about 2,500 t/d. From commissioning through end-February 2024: 87 doré shipments totaling 82,670 oz gold and 1,670,636 oz silver contained. Received the Presidential Mineral Industry Environmental Award (PMIEA) in 2022
Canatuan Zamboanga del Norte (Siocon) TVIRD (now closed) One of the earliest projects under the 1995 Mining Act. Gold and silver from the oxidized cap (gossan) of a VMS deposit, transitioning to copper concentrate from the sulfide zone (commercialized 2009). Closed in January 2014 due to ore depletion. A long-running dispute over Mount Canatuan, sacred to the Subanon indigenous people, makes it a standard reference case when discussing IPRA and FPIC
T'Boli South Cotabato Rizal Resources Corp. (TSXV: RZL) About 40 km from General Santos City. A NI 43-101 technical report was issued in March 2018. Two vein systems, north and south. In late 2016, TMC-Tribal Mining reached an agreement with local small-scale miners (the Maguan family's cooperative, the T'boli Minahang Bayan cooperative) ending roughly 20 years of dispute. Still at the development stage, with no commercial production reached as of 2026 (unconfirmed)

4. Two Major Projects Under Development

4-1. Silangan Project — could it become the country's first new large-scale mine in 2026?

Item Detail
Location Tubod, Surigao del Norte Province (the Boyongan ore body is Phase 1)
Operator Philex Mining (via Silangan Mindanao Mining Co., Inc., SMMCI)
Resources Boyongan mineable reserve of 81 Mt @ 0.67% Cu, 1.13 g/t Au, recoverable copper 993 M lb, recoverable gold 2.8 Moz (PMRC-compliant). District-wide resources total 571 Mt (up 43% from a previous 398 Mt). Mine life across the district is 28 years (supplemented 2026-08-25 during cross-referencing; field "Mining and Nickel," Chapter 6, had described Phase 1 as "22 years," and the figure has been standardized to 28 years)
Products Copper cathode plus gold doré (the country's first fully automated gold/copper oxide-ore processing plant; the first domestic copper leaching operation)
Investment An additional US$1 billion, plus ₱18 billion already spent on pre-development

Production plan: initial 2,000 t/d → 4,000 t/d (with an additional $160 m) → 8,000 t/d by Year 9 → up to 12,000 t/d by Year 12. 注Sources disagree on the timeline for reaching 4,000 t/d. This material states "in about 18 months"; field "Copper and Other Metal Resources," section 3-4, states "5 years at 2,000 t/d, then 4,000 t/d starting Year 6." The initial 2,000 t/d and the Year-12 peak of 12,000 t/d are consistent across sources. Confirmation from Philex's official disclosures is needed = unconfirmed. Both versions are presented here rather than dropping either (cross-referenced 2026-08-25). The ore grade is roughly six times that of Padcal, so despite lower tonnage the project is expected to generate more revenue than Padcal. The shifting timeline (an easy source of errors): originally "commercial production in March 2026" (per Chairman Pangilinan) → as of November 2025, "first pour in Q1 2026" → revised in the Q1 2026 earnings release (May) to "within 2026" → revised again at the June 2026 annual shareholders' meeting to "first pour and commercial operations start in Q3 2026" → the latest disclosure, from late July 2026, states that plant commissioning will be completed in Q4 2026 (added 2026-08-25 during cross-referencing; the earlier note had stopped at "Q3," an outdated target left in place. Source: field "Copper and Other Metal Resources," section 3-4/"Gold Institutions, Taxation, and BSP," section 9-2). 注 As of 24 August 2026, whether first pour has actually occurred could not be confirmed (unconfirmed). The company has stated revenue contribution will begin in 2027. Financial position: Q1 2026 saw a core net loss of ₱281 m (versus a core profit of ₱71 m in the same period the prior year); consolidated loss of ₱592 m (due to reduced Padcal output plus a non-cash forex valuation loss on dollar-denominated borrowings). Construction is by EEI Corp.; commissioning is by Ausenco Pty Ltd. This is expected to be the first major mining project to enter commercial production under the Marcos administration.

4-2. Tampakan — one of the largest undeveloped copper-gold porphyry deposits in Southeast Asia

Item Detail
Location Tampakan, South Cotabato Province, to Kiblawan, Davao del Sur Province. FTAA area of 25,371 ha, with the mine site itself covering about 10,000 ha
Operator Sagittarius Mines, Inc. (SMI)
Resources 2.94 Bt @ 0.51% Cu, 0.19 g/t Au (at a 0.2% Cu cutoff) = 15.0 Mt contained copper, 17.6 Moz contained gold. M&I is 2.27 Bt @ 0.55% Cu. JORC (2004 edition)-compliant, as of end-December 2011 (disclosed to the ASX in January 2012)
Planned production An average of 375,000 t copper and 360,000 oz gold per year in concentrate, with a mine life of 17 years (some reports cite over 40 years)

注注 Tampakan's headline figures are Mineral Resources, not reserves. No publicly disclosed JORC-compliant Ore Reserve could be confirmed (unconfirmed). 注 Additionally, this resource estimate dates to end-2011 and has not been updated in nearly 15 years. The figure "2.94 Bt at 0.6% Cu" (found on Wikipedia, among other places) is an error that conflates the older estimate (2.49 Bt @ 0.6%, at a 0.3% cutoff) with the newer one. 注 Both US$5.9 billion and US$1.1 billion circulate as development-cost figures, and it is unclear which scope each refers to (full development vs. an initial phase). Figures like "$200 billion" or "$150–200 billion" represent the gross in-situ value of the metal in the ground — not an investment figure or a profit figure.

The saga of the open-pit mining ban ordinance (a sequence worth knowing well) 1. 2010: South Cotabato Province banned open-pit mining under its environmental code. Since SMI had concluded open-pit mining was the only feasible method, this effectively halted the project. 2. 2015: Glencore (then holding 62.5% of SMI) withdrew, citing regulatory uncertainty. The remaining 37.5% was held by Australia's Indophil Resources NL group, later acquired by Alsons Prime Investments of the Alcantara conglomerate. 3. December 2021: the national government lifted the nationwide open-pit mining ban. However, the provincial ordinance remained, preventing development. 4. May 2022: the provincial legislature (Sangguniang Panlalawigan) amended its environmental code, deleting the open-pit mining ban provision — removing the last regulatory barrier. 5. The target production start date has slipped from "Q4 2026" to 2028. 6. 20 August 2026: the board of Dominion Holdings Inc. (PSE: DHI, linked to the Sy and Consunji conglomerates; formerly BDO Leasing and Finance) approved a merger with Indophil Resources Phils., Inc. and Sonar Holdings Inc., with DHI as the surviving entity (PSE disclosure). The two companies together hold SMI at Indophil 40%/Sonar 31.60% = combined economic interest of 71.60%, 100% of voting rights; on completion of the merger, DHI will gain control of SMI. Authorized capital is being increased from ₱3.42 bn to ₱30 bn. The shareholders' meeting is set for 14 September 2026. The merger ratio will be finalized after an independent valuation. (Corrected 2026-08-25 during cross-referencing. The earlier note gave the date as "19 August" and cited only the "100% voting rights" figure. Source: field "Copper and Other Metal Resources," section 3-5/"Gold and Investment, Japanese Companies," section 10-4/"Comprehensive Review of Underground Resources," section 4-3, all of which give 20 August and the 71.60% economic-interest figure) 7. Market reaction: DHI shares rose over 1,000% in 2026 to ₱15.60 (market cap ₱33.7 bn), with trading briefly halted after the announcement. Alcantara-linked Alsons Consolidated Resources also rose as much as 40%. DHI has also already acquired a 20.43% stake in Atlas Consolidated Mining, with SM Investments set to transfer roughly a 34% stake in 2027 — pointing toward a plan to combine Tampakan and Atlas into the country's largest mining holding company.

注 Opposition continues. The Diocese of Marbel has consistently opposed the project on environmental and food-security grounds, and the 30-year standoff has produced numerous deaths on both sides. In litigation over more than ₱400 million in disputed taxes claimed by the municipality of Tampakan, the Court of Tax Appeals (CTA) has stayed enforcement of a collection order issued by the Koronadal Regional Trial Court.


5. PSE-Listed Companies and the 2025–2026 Gold Price Surge

5-1. Gold price levels (always factor these in)

Point in Time Price Source
H1 2025 peak US$3,354.35/oz MGB H1 2025 review
2025 OceanaGold realized average US$3,494/oz OceanaGold
Q4 2025 Philex realized US$4,338/oz Philex
29 January 2026, all-time high US$5,608.35/oz (注some datasets give the same day's futures high as US$5,542.40/oz; the difference likely reflects intraday vs. closing-basis measurement, but this is unconfirmed = noted 2026-08-25 during cross-referencing, both figures given) Trading Economics
Spot price, 2026-08-24 US$4,645.74/oz (+37.98% year-on-year) 注this material's prior figure of US$4,648.18/+38.05% differs slightly Trading Economics (corrected 2026-08-25 during cross-referencing; three fields in this cluster — "Gold Reserves and Deposits," "Gold Institutions, Taxation, and BSP," "Gold and Investment, Japanese Companies" — agree on $4,645.74 / +37.98%, so the majority figure was adopted)
H1 2026 realized average Apex US$4,656/oz (+49%)/Lepanto US$4,684.40/oz (+51.8%) Company disclosures

Silver surged simultaneously (Apex's H1 2026 realized price was $77.67/oz, +134%). Peso weakness (average ₱59.97/US$ in H1 2026, versus ₱57.06 the prior year) also boosted the peso-translated profits of dollar-revenue domestic listed companies.

5-2. The common 2025–2026 pattern: "lower volume, higher price, record profit"

Company (PSE) Main Mine Volume Profit
Apex Mining (APX) Maco Gold sales ▲16% (H1 2026) Net profit +68% (₱5.39 bn)
OceanaGold Philippines (OGP) Didipio Gold ▲7%, copper ▲17% Net profit +206% ($67.4 m)
Lepanto (LC/LCB) Victoria/Teresa Gold ▲7% Net profit more than doubled (₱1.59 bn)
Benguet Corp (BC/BCB) Acupan, etc. Small scale Full-year 2025 net profit +74.4%
Philex Mining (PX) Padcal Gold ▲21% (2025) 2025 core net profit ₱1.071 bn (revenue up)/loss in Q1 2026
B2Gold (BTO/BTG, Canada) Masbate 196,526 oz in 2025 (guidance achieved) 2025 consolidated revenue exceeded $3 billion for the first time

Sector-wide: on 20 August 2026, the PSE's mining and oil sub-index rose 5.04% in a single day, the largest gain of any sector (Apex +9.26% to ₱15.58; Philex +7.32% to ₱10.70). Philex's target share price was raised from ₱2.20 to ₱11.00 over the preceding five quarters. 注 "Rising profit" does not equal "rising production." As the table above shows, nearly every company posted record profits while volumes fell. Any write-up should always separate volume from price.

5-3. Policy: RA 12253 (enacted 4 September 2025)

The Enhanced Fiscal Regime for Large-Scale Metallic Mining Act (Republic Act No. 12253).

Item Detail
Royalty (outside mineral reservations) A margin-linked five-tier rate of 1–5%. Mines below the threshold margin pay a minimum royalty of 0.1% of gross output
Royalty (within mineral reservations) Unchanged at 5%
Windfall profits tax A five-tier rate of 1–10% on the portion of margin exceeding 30%
Thin-capitalization rule Debt-to-equity ratio capped at 2:1. Limits interest deductions on related-party borrowing
Ring-fencing Applied per project. Losses from one project may not offset profits from another
Transparency Auditing of mineral sales and exports, data disclosure, and establishment of a multi-stakeholder accountability group
Projected revenue A total of ₱25.08 bn for 2026–2029 (averaging ₱6.26 bn/year, per the Department of Finance)

The industry has credited this law as "the catalyst that brought the Philippines back as an investable mining destination," with OceanaGold's $1.9 billion investment decision (July 2026) cited as its first concrete proof point.


6. 注 Points to Know or Get Wrong (Full Summary)

  1. 注 Do not conflate "reserves," "resources," and "endowment." Tampakan's 17.6 Moz is a resource; Didipio's 1.13 Moz is a reserve. It's natural for the order of magnitude to look different.
  2. 注 "World's 2nd-largest gold reserves" has no clear source. As a claim about central bank gold reserves, it is clearly false (around 26th in the world, per Rappler's fact-check). As a claim about underground reserves, it cannot be traced to a primary source.
  3. 注 "US$1 trillion in undeveloped minerals" is a rough government-PR estimate of in-situ value — not a JORC/PMRC reserve figure. An MGB official has himself acknowledged it as a "rough estimate."
  4. 注 The Co-O Mine is operated by Philsaga Mining (formerly Medusa, now 40% X64 Gold) — not Benguet Corp or Apex Mining.
  5. 注 MGB statistics move between provisional and final figures. The same period can show different numbers depending on when it was published — always note "as reported by MGB in [month/year]."
  6. 注 The large-scale : small-scale production ratio cannot be stated precisely. "70–80% small-scale" is a PIDS/DENR-EMB estimate; smuggled output is not captured in official statistics.
  7. 注 The 2025–2026 profit surge is driven by gold price and peso weakness, not volume. Production has actually been flat to declining.
  8. 注 Siana (TSF collapse, May 2024) and Padcal (tailings pond breach, 2012) are two separate accidents. Do not conflate them.
  9. 注 Both "operations start March 2026" and "Q3" for Silangan are outdated. The latest disclosure, from late July 2026, states plant commissioning will complete in Q4 2026. Whether first pour has actually occurred remains unconfirmed as of this writing (updated 2026-08-25 during cross-referencing).
  10. 注 "Tampakan starts operations in 2026" is also outdated. The current target is 2028, and as of August 2026 a transfer of control to Dominion Holdings is underway.

日本語の詳細版: 分野「鉱業・資源」「主要金鉱山と生産」(本サイト日本語版)。