The Philippines' Military and Defense — The AFP, Modernization, Alliances, and Relations with Japan
0. Ten Lines to Start With
| # | Issue | Summary |
|---|---|---|
| 1 | A shift in character | The military is transitioning from a half-century of an "inward-facing" force (against communist guerrillas and Islamist armed groups) to an "outward-facing" one (external defense in the South China Sea/West Philippine Sea). Since 2024, the Armed Forces of the Philippines (AFP) itself has officially positioned external defense as its primary mission |
| 2 | Troop strength | Active forces of roughly 150,000 (the Army is the largest branch). Registered reserves exceed 1 million, but fewer than 100,000 are "ready" |
| 3 | Budget | Low even by Southeast Asian standards. As a share of GDP, it has long hovered around 1% |
| 4 | Modernization | Re-Horizon 3 (approved by President Marcos in January 2024, worth up to $35 billion over 10 years) is the current centerpiece |
| 5 | Air | The South Korean FA-50 is the only fighter aircraft; 12 more were ordered in 2025 |
| 6 | Sea | Frigates and patrol vessels from South Korea's HD Hyundai keep entering service one after another. Submarines remain at the "concept" stage |
| 7 | Missiles | The Philippines holds India's BrahMos supersonic anti-ship missile (operated by the Marine Corps' coastal defense regiment) |
| 8 | Japan | Mitsubishi Electric's air-surveillance radar was Japan's first "complete defense equipment" export since World War II, and the Philippines was the recipient. ODA patrol vessels, OSA, the RAA, and the ACSA continue to build up bilateral cooperation |
| 9 | US | 9 EDCA sites. The deployment of the Typhon (medium-range missile system) is the biggest flashpoint with China |
| 10 | Human resources | ROTC has been "elective" since 2002. Bills to make it mandatory keep being filed but have not passed |
1. The Basic Structure of the AFP
1-1. Organization
The Armed Forces of the Philippines (AFP) sits under the Department of National Defense (DND). It has 3 service branches plus a unified command system.
| Category | Detail |
|---|---|
| Branches | Army (Philippine Army, PA) / Navy (Philippine Navy, PN, including the Philippine Marine Corps) / Air Force (Philippine Air Force, PAF) |
| Operational command | 7 regional Unified/Area Commands: NOLCOM (Northern Luzon) / NCRCOM (National Capital Region) / SOLCOM (Southern Luzon) / VISCOM (Visayas) / WESCOM (Western — Palawan/South China Sea) / EASTMINCOM (Eastern Mindanao) / WESTMINCOM (Western Mindanao) (corrected in the 2026-08-25 cross-check; the earlier "6 to 7" range reflected uncertainty. Source: the "Military, Police, and Security Institutions" article, §2-3, which lists all 7 individually) |
| Distinguishing feature | Follows a US-style unified command system, but is unusual in that its geographic divisions are organized by island group |
注 The Philippine Coast Guard (PCG) is not part of the AFP. In peacetime, the PCG is a civilian law-enforcement agency under the Department of Transportation (DOTr), coming under the Department of National Defense's command only in wartime (see Section 8). This is analogous to the relationship between Japan's Coast Guard and Ministry of Defense.
1-2. Troop Strength (Figures from Various Sources)
| Item | Figure | Year/Source |
|---|---|---|
| Total active personnel | 154,870 | 2025, said to be an AFP-published baseline figure (注 multiple sources cited, primary source unconfirmed. Global Firepower estimates 160,000) |
| Army | ~110,000 | 2025, same (11 infantry divisions + 1 armored division + Special Operations Command) |
| Navy | 27,270 (including 10,300 Marines) | Same |
| Air Force | 17,600 | Same |
| Reserves (registered) | ~1.2 million (of which Ready Reserve is ~86,000) | June 2023, AFP Reservist Command (AFPRESCOM) figure |
注 A textbook case of old and new figures being mixed together. Japanese-language articles still often cite the 2023-era figures of "troop strength ~150,000 / defense budget $4.31 billion / GDP share 0.97%" (some encyclopedia-type sources also carry these). These are three years out of date relative to 2026 — take care.
注 The figure "1.8 million reservists" also circulates (some encyclopedia-type sources cite Ready Reserves at 1,800,000 as of 2024; 注 primary source unconfirmed). AFPRESCOM's own breakdown, meanwhile, is "86,000 ready + 1.1 million standby." The number on a registration roster and the number actually mobilizable are entirely different things — do not cite the registered figure on its own.
1-3. Commanders (Current as of August 2026)
| Post | Name | Took office | Notes |
|---|---|---|---|
| Secretary of National Defense | Gilberto "Gibo" C. Teodoro Jr. | 5 June 2023 | Still in office as of August 2026. Takes a hawkish stance toward China, calling it a "squatter" |
| Chief of Staff, AFP | Gen. Antonio G. Nafarrete | 21 July 2026 | Predecessor was Gen. Romeo Brawner Jr., who served 21 July 2023 – 21 July 2026, a full term |
| Prior post | Army Commander (from 31 July 2025) | PMA Class of 1990 ("Bigkis-Lahi"), a former Scout Ranger |
注 "The AFP's top officer is Gen. Brawner" is information current only through 20 July 2026. Any material dated in the latter half of 2026 or later must be updated to Gen. Nafarrete. Under Republic Act No. 11939, the Chief of Staff now serves a fixed 3-year term (correcting the old practice of turnover every few months upon reaching retirement age), running through July 2029.
- On 11 June 2026, the Chinese government imposed sanctions and an entry ban on Secretary Teodoro and his family (per the 2026 events timeline). Sanctions against an individual cabinet member are unusual and symbolize the chill in Philippines-China relations.
2. The Budget — "Low as a Share of GDP" Is the Core Structural Problem
| Indicator | Figure | Year/Source |
|---|---|---|
| AFP budget | ₱395.872 billion (~$6.74 billion) | 2026, said to be on a GAA basis (注 multiple sources cited, primary source unconfirmed. Some reporting on DBM's "2026 NEP" instead puts total DND spending at ₱30.5872 billion, with ₱29.2483 billion for the AFP portion — this does not match the figure in this article and needs re-verification) |
| Share of GDP | 1.35% | 2026, same (注 primary source unconfirmed) |
| (Old figure) Defense budget | $4.31 billion / 0.97% of GDP | 2023, a figure cited by multiple secondary sources (注 primary source unconfirmed) |
| DND budget | ₱288.356 billion | 2024 (注 multiple sources cited, primary source unconfirmed) |
| Modernization allocation (AFP Modernization) | 2025: ₱50 billion / 2026: ₱90 billion (record high) | 注 Multiple sources cited, primary source unconfirmed (some reporting, e.g. Manila Bulletin, instead puts the 2026 AFP Modernization guaranteed allocation at ₱40 billion and 2025's at ₱35 billion — this does not match the figures in this article and needs re-verification) |
注 There are three different "units" for these figures — do not conflate them. 1. AFP budget (the military itself) 2. DND budget (the entire defense department — AFP plus civilian defense bureaus, the veterans' affairs office, etc.) 3. International comparison figures such as SIPRI's (which treat pensions and paramilitary forces differently from domestic accounting) → Even for the same year, the numbers can diverge by 20–30% depending on definition. Whenever you write "Philippine defense spending is X," always specify which definition you mean.
注 The modernization budget is only a fraction of the overall defense budget. The "₱90 billion in 2026" figure above is the equipment-procurement allocation; the bulk of the ~₱395.9 billion AFP budget goes to personnel costs, pensions, and upkeep. The long-standing critique is that salaries and pensions are squeezing out the defense budget.
- The SIPRI Military Expenditure Database covers 1949 through 2025 (as of August 2026, per the SIPRI website). A finalized international comparison figure for 2026 is not yet available. When citing a 2026 figure, be clear that it is a "budgeted (planned) amount," not a "confirmed actual expenditure."
[On global rankings] 注 Claims such as "the Philippine military ranks #X in the world" are widespread online, and most trace back to the "PowerIndex" of Global Firepower (GFP). GFP is not a peer-reviewed official statistic but a private ranking with its own proprietary scoring, and the makeup of its index (a composite of troop numbers, equipment counts, geography, and finances) changes from year to year. This article does not adopt any such ranking (treated as unconfirmed). If you need to cite a ranking, always specify what it measures and who produced it.
3. Modernization — From Horizon to Re-Horizon 3
3-1. Legal Framework
| Law | Year | Content |
|---|---|---|
| Republic Act No. 7898 (RA 7898, AFP Modernization Act) | 1995 | Under President Ramos. Initially ₱50 billion over 5 years. Derailed by the 1997 Asian Financial Crisis |
| Republic Act No. 10349 (RA 10349, Revised AFP Modernization Act) | 2012 | Under President Aquino III. Extended 15 years, with ₱75 billion for the first 5 years |
3-2. The Three "Horizons"
| Phase | Period | Scale | Main achievements |
|---|---|---|---|
| Horizon 1 | 2013–2017 | ₱75 billion (initial allocation) | 12 FA-50PH jets, ordering of the Jose Rizal-class frigates, etc. |
| Horizon 2 | 2018–2022 | ~₱300 billion (~$5.6 billion) | BrahMos contract, SPYDER air defense, Tarlac-class landing platform docks, etc. |
| Horizon 3 | 2023–2028 | — | Its content was completely overhauled before implementation began |
3-3. Re-Horizon 3
| Item | Detail |
|---|---|
| Approval | Approved by President Ferdinand "Bongbong" Marcos in January 2024 |
| Scale | Up to $35 billion total, over 10 years |
| Overarching concept | The Comprehensive Archipelagic Defense Concept (CADC) — force projection across the entire EEZ, air/maritime domain awareness, and strengthened communications and intelligence capability |
| Positioning | Scrapped the original Horizon 3 (2023–2028) procurement list and reorganized it into an externally focused defense plan |
注 Describing "Re-Horizon 3" simply as "2023–2028" is half-wrong. The name carries over from the third phase, but in substance it is a re-designed program approved in 2024 and running roughly 10 years (into the early 2030s). The accurate description is: "the original 2023–2028 Horizon 3 envelope was restructured into a 10-year plan when it was approved in 2024."
注 The "$35 billion" figure is a planned/aspirational requirement, not a secured budget. The actual annual budget, as noted above, remains around ₱90 billion (roughly $1.5 billion) for 2026 — the gap between the plan and actual spending is the biggest risk. Always distinguish between the government's official budget (GAA) and the figures the military/DND cite as the plan.
4. Major Equipment
4-1. Air Force (PAF)
| Equipment | Quantity/status | Notes |
|---|---|---|
| KAI FA-50PH (South Korea) | 12 contracted (28 March 2014, ₱18.9 billion/~$421 million), delivered November 2015–May 2017. 11 remain in service as of 2026 | On 4 March 2025, one crashed on Mt. Kalatungan, Bukidnon, killing both crew (night flight during anti-NPA operations) |
| FA-50 Block 70 additional order | 12 more ordered (announced March 2025) | Existing aircraft also planned for upgrade to Block 60/70-equivalent standard |
| A-29B Super Tucano (Brazil) | 6 additional ordered, ₱6.59 billion | Light attack aircraft |
| C-130J-30 (US) | 3, ₱22.2 billion | Transport |
| S-70i Black Hawk (built in Poland) | 32 ordered, ~₱32 billion | Utility helicopter |
| SPYDER-MR (Israel, Rafael) | 3 batteries (2 in November 2022, 1 more added November 2024) | Medium-range air defense |
| J/FPS-3ME (Japan, Mitsubishi Electric) | Fixed-type. First unit delivered October 2023, handed over to the PAF 20 December 2023. Detection range 611 km | 2 more fixed units planned for phase 2 |
| J/TPS-P14ME (Japan, Mitsubishi Electric) | 1 mobile unit, mounted on a Mitsubishi Fuso Canter chassis | Delivered April 2024 |
注 The Philippine Air Force still has no "true fighter jet." The FA-50 is a light fighter derived from an advanced trainer; procuring a true multirole fighter (MRF) is a flagship goal of Re-Horizon 3, but as of August 2026 no publicly confirmed information exists on a chosen aircraft or signed contract (unconfirmed). Articles claiming "the Philippines has acquired X fighter jets" are usually either about the FA-50 or about proposals/negotiations still in progress.
4-2. Navy (PN)
| Class | Current status |
|---|---|
| Jose Rizal-class frigate | 2 ships. BRP Jose Rizal (FFG-150/14) commissioned 10 July 2020, BRP Antonio Luna (FFG-151/15) commissioned 19 March 2021. Built by Hyundai Heavy Industries (HHI). About $168.5 million/₱7.872 billion per ship (2016) |
| Miguel Malvar-class frigate | HD Hyundai Heavy Industries' HDC-3100 design. BRP Miguel Malvar (FFG-06) commissioned 20 May 2025 / BRP Diego Silang (FFG-07) commissioned 2 December 2025. 2 more (FFG-08, -09) additionally ordered (expected delivery 2027–2029) |
| Rajah Sulayman-class offshore patrol vessel (OPV) | HD Hyundai. Contracted 27 June 2022, 6 vessels. ~₱5 billion/$95.5 million each. PS-20 commissioned 24 February 2026, PS-21 commissioned 9 June 2026 |
| Conrado Yap-class corvette | 1 in service (transferred from South Korea); 2 more transfers expected |
| Tarlac-class landing platform dock (LPD) | 2 in service, 2 under construction (PT PAL, Indonesia) |
| Acero-class missile boat | 8 in service as of May 2025 (Israeli Shaldag Mk V) |
| Submarines | Not yet acquired. Still at the concept stage. A "Submarine Group" has been pre-established within the fleet. France's Naval Group has proposed the Scorpène class |
注 "The Philippine Navy operates 4 Jose Rizal-class frigates" is incorrect. The Jose Rizal class comprises 2 ships; its successor, the Miguel Malvar class (2 commissioned + 2 on order), is a separate class. Both share the same HD Hyundai design lineage (HDF-2600 → HDC-3100), but they are different types.
注 Submarines remain at the "concept and proposal-received" stage (as of August 2026, no publicly confirmed contract — unconfirmed). Headlines claiming "the Philippines is acquiring submarines" are often based on releases from prospective sellers.
- On 12 January 2026, the DND announced a ₱5.349 billion direct contract with HD Hyundai to retrofit CIWS (close-in weapons system) and towed-array sonar (TASS) onto the Jose Rizal-class ships. At commissioning these were "fitted-for-but-not-with" — this fills that gap, a typical example of the Philippines' incremental, phased approach to equipping its ships.
4-3. BrahMos Supersonic Anti-Ship Missile
| Item | Detail |
|---|---|
| Contract | Signed 28 January 2022 with India's BrahMos Aerospace. $374,962,800 |
| Quantity | 3 batteries. Each battery = 3 mobile launchers (3 missiles each) + command-and-control vehicle + radar |
| Operating unit | The Shore-Based Anti-Ship Missile Battalion (SBASM Bn) of the Philippine Marine Corps' Coastal Defense Regiment |
| Deliveries | 1st batch delivered 19 April 2024 (airlifted by Indian Air Force C-17 and Il-76) / 2nd batch delivered 20 April 2025 (by sea) / 3rd batch was at the delivery-preparation stage as of August 2026 |
| Base | Naval Station Leovigildo Gantioqui, Zambales. Construction began August 2022 |
| Performance (export variant, Block I) | Speed Mach 3, range ~290 km |
Significance: The Philippines' first-ever long-range strike capability able to "shoot back." The Marine Corps' Coastal Defense Regiment, stood up 7 August 2020, comprises two battalions — the anti-ship missile battalion and a coastal air-defense battalion. It embodies a shift in thinking: A2/AD (anti-access/area denial) being practiced by the Philippines in the Luzon Strait, rather than against it.
4-4. Army (PA)
- 11 infantry divisions, 1 armored division ("Pambato"), 1 combined-arms brigade, 1 artillery regiment, and Special Operations Command (the Scout Ranger Regiment, Special Forces Airborne Regiment, and Light Reaction Regiment).
- A 1st Land-based Missile System Battery has been newly formed under the artillery regiment — the Army too has begun fielding missile units.
- Major equipment: ASCOD 2 Sabrah light tanks (Israel's Elbit), ATMOS 2000 self-propelled howitzers, M113 armored personnel carriers, and Simba armored wheeled vehicles.
5. Transfers and Defense Cooperation from Japan
For Japan, the Philippines is "the testing ground for its postwar policy of equipment transfer" — the most heavily covered topic in Japanese-language reporting.
5-1. Mitsubishi Electric's Air-Surveillance Radar — The First Complete Equipment Export Since World War II
| Item | Detail |
|---|---|
| Announcement | On 28 August 2020, Japan's Ministry of Defense announced that a contract for the export of 4 air-surveillance and control radars (3 fixed, 1 mobile) to the Philippines had been concluded between Mitsubishi Electric and the Philippine government |
| Significance | The first "complete defense equipment" export under the Three Principles on Transfer of Defense Equipment and Technology (approved by Cabinet decision on 1 April 2014). Prior transfers had been limited to components, technology, or used equipment (such as the TC-90) |
| Models | Fixed: J/FPS-3ME; mobile: J/TPS-P14ME |
| Delivery | First fixed unit delivered October 2023, handed to the PAF 20 December of the same year; 1 mobile unit delivered April 2024. The remaining 2 fixed units are part of phase 2 |
注 The phrase "the first complete-equipment export" is accurate, but it is not "the first arms export since World War II." There were exports before the 1967 Three Principles on Arms Exports, as well as separate component and technology transfers. The accurate phrasing is: "the first case of exporting complete defense equipment under the Three Principles on Transfer of Defense Equipment and Technology."
注 The contract value has not been confirmed in any public statement or reporting on the Japanese side (unconfirmed). Figures said to represent the Philippine side's procurement budget circulate, but should not be stated as the contract value.
5-2. Coast-Guard-Related ODA Patrol Vessels (For the Philippine Coast Guard)
| Project | Detail | Year |
|---|---|---|
| 44-meter-class multipurpose response vessels (Parola class), 10 ships | Yen loan of ¥18.732 billion (contracted December 2013). Based on the Japan Coast Guard's "Bizan" class. Built by Japan Marine United | Delivered 2016–2018 |
| 97-meter-class large patrol vessels (Teresa Magbanua class), 2 ships | Yen loan contracted October 2016. Based on the Japan Coast Guard's "Kunigami" class. Built by Mitsubishi Shipbuilding | Delivered 2022 |
| 5 additional 97-meter-class ships | In October 2023, the PCG chief indicated additional vessels were likely, bringing the total to 7 ships. The yen-loan agreement was signed in May 2024, and the Department of Transportation (DOTr) issued a bid announcement on 5 January 2026 (progress supplemented in the 2026-08-25 cross-check; the earlier draft only said "in progress," missing the 2024–2026 milestones. Source: the "Military, Police, and Security Institutions" article, §6-2) | Expected to enter service 2027–2028 |
注 (Corrected in the 2026-08-25 cross-check) This section's earlier reference to a "40-meter-class multipurpose vessel (Parola class)" was incorrect. The Parola class is 44.5 meters overall (i.e., 44-meter-class). This document's own Section 7 on the PCG describes it as "10 Parola-class 44-meter-class vessels" — the same document had an internal inconsistency between 40m and 44m. The "Military, Police, and Security Institutions" article, §6-2, also records "44-meter multipurpose response vessel." Source replaced 2026-08-27. Source: Philippine Coast Guard (PCG) official site, "PCG welcomes last 44-meter vessel from Japan" (coastguard.gov.ph) — states an overall length of 44 meters, built by Japan Marine United (Yokohama). Retrieved 2026-08-27. 注 Also note: the ¥18.732 billion yen loan (2013, Japan's disbursement ceiling) and the same project's Philippine-side contract breakdown (JICA portion ₱7,373,700,000 + Philippine government portion ₱1,434,000,000) are figures in different currencies and different scopes — do not treat "the ¥18.7 billion yen loan" as equivalent to "the contract amount."
Significance: Japan's core support to the Philippines has long been directed at the "coast guard," not the "military." Given constitutional and public-opinion constraints, this is a method of building maritime capability through law-enforcement-oriented ODA. The Teresa Magbanua class is the PCG's largest vessel and has been deployed to the front line of confrontations in the South China Sea.
5-3. OSA (Official Security Assistance)
Formally decided at a National Security Council meeting on 5 April 2023. Separate from ODA, this framework provides equipment and infrastructure free of charge to the militaries of like-minded countries. The Philippines has been a major recipient from the very first year.
| Fiscal year | Exchange of notes | Amount | Content |
|---|---|---|---|
| FY2023 | 3 November 2023 | ¥600 million | Coastal surveillance radar system |
| FY2024 | 5 December 2024 | ¥1.6 billion | Surveillance equipment |
| FY2025 | 15 January 2026 | ¥900 million | Construction of a rigid-hull boat storage facility and slipway |
注 OSA should be read on the premise that "the amounts are small." Allocations to the Philippines run to a few hundred million to just over a billion yen per fiscal year — three orders of magnitude smaller than Re-Horizon 3's $35 billion. It is a framework with outsized symbolic and political significance, not a major source of equipment. 注 Total OSA amounts by fiscal year (summed across all recipient countries) vary depending on how the figures are compiled, with some tallies putting them at roughly ¥1.975 billion in FY2023 → ~¥5 billion in FY2024 → ~¥10 billion in FY2025. When citing a total, specify whether it is a sum of individual projects or a budget appropriation.
5-4. Transfer of Abukuma-class Destroyer Escorts (The Biggest Topic of 2025–2026)
| Timing | Development |
|---|---|
| 6 July 2025 | Reports that the two governments had entered talks on transferring 6 Abukuma-class destroyer escorts slated for retirement from the Japan Maritime Self-Defense Force to the Philippine Navy |
| 5 May 2026 | Defense Minister Shinjiro Koizumi visits the Philippines, firming up the framework |
| 7 July 2026 | The Philippine side (Secretary Teodoro) confirms acquisition of 5 of the 6 ships. The framework is OSA (Official Security Assistance) — a grant, free of charge. The transfer will begin after the ships' retirement from the JMSDF (expected 2027) (framework supplemented in the 2026-08-25 cross-check. Source replaced 2026-08-27; the earlier draft cited the English-language Wikipedia article "Abukuma-class destroyer escort." Sources: Manila Bulletin, "Teodoro: Deal for 5 Japanese warships completed," 8 July 2026; Philstar, 8 July 2026. Retrieved 2026-08-27; the "Bilateral Relations in Detail" article carries the same account) |
- The Abukuma class: full load displacement ~2,550 tonnes, length 109m, 27 knots. Armed with Harpoon anti-ship missiles, ASROC, a 76mm gun, and a Phalanx CIWS (the armament configuration at the time of transfer is said to be adjustable to requirements, and the final specification remains undetermined).
- 注 The phrase "Japan is selling/exporting destroyer escorts to the Philippines" circulates widely, but this is a transfer of used (soon-to-retire) vessels, not an export of newly built ships, and moreover it falls under the OSA (grant, free of charge) framework — meaning the Philippine side is not paying for the hulls, unlike a "sale." 注 However, who bears the cost of refit, armament configuration, and transport had not been disclosed as of August 2026 (unconfirmed). Do not assume "free means zero cost to the Philippine side." (Clarified the paid/unpaid distinction in the 2026-08-25 cross-check)
5-5. The Framework of Japan-Philippines Agreements
| Agreement | Signed | Entered into force |
|---|---|---|
| Defense Equipment and Technology Transfer Agreement | 29 February 2016 | — |
| Reciprocal Access Agreement (RAA) | July 2024, Senate ratification 16 December 2024 (Resolution No. 1248, unanimous) | Entered into force 11 September 2025 |
| Acquisition and Cross-Servicing Agreement (ACSA) | Signed in Manila 15 January 2026 (reciprocal provision of ammunition, fuel, etc.) | Entered into force 22 August 2026 |
The RAA is Japan's third such framework after the UK and Australia, and its first with an Asian country. With the ACSA in force, Japanese and Philippine forces can now exchange fuel, ammunition, and transport support during exercises and disaster response.
- In May 2026, timed with President Marcos's visit to Japan, the two sides agreed to strengthen arms sales, information sharing, and joint exercises from Japan; maritime boundary delimitation talks also began around the same time.
- On 21 April 2026, Japan is said to have substantially revised the operational guidelines under the Three Principles on Transfer of Defense Equipment and Technology, abolishing the "5 categories" restriction (rescue, transport, warning, surveillance, and minesweeping) that had previously applied, in principle allowing the transfer of lethal equipment for the first time (注 based on some encyclopedia-type sources; primary source unconfirmed). 注 If true, this would raise the ceiling on Japan-Philippines equipment cooperation by a significant margin, but the details of the operational guidelines and their treatment in the Diet require verification.
6. The US-Philippines Alliance — EDCA and Typhon
6-1. Framework
- Built on the 1951 US-Philippines Mutual Defense Treaty (MDT). Because the Philippine Constitution prohibits permanent foreign bases, US forces operate on a "rotational deployment" basis rather than being "permanently stationed."
- The 2014 Enhanced Defense Cooperation Agreement (EDCA) allows the US to build and use facilities inside Philippine military installations.
6-2. EDCA Sites (9 Locations)
| # | Site | Location | Designated |
|---|---|---|---|
| 1 | Basa Air Base | Pampanga | 19 March 2016 |
| 2 | Fort Magsaysay | Nueva Ecija | Same |
| 3 | Antonio Bautista Air Base | Palawan | Same |
| 4 | Benito Ebuen Air Base | Cebu | Same |
| 5 | Lumbia Airport | Cagayan de Oro | Same |
| 6 | Naval Base Camilo Osias | Santa Ana, Cagayan | 3 April 2023 |
| 7 | Lal-lo Airport | Lal-lo, Cagayan | Same |
| 8 | Camp Melchor Dela Cruz | Gamu, Isabela | Same |
| 9 | Naval Base Narciso del Rosario | Balabac Island, Palawan | Same |
The geographic logic of the 4 sites added in 2023: sites 6–8 are in the far north of Luzon (the Luzon Strait, facing Taiwan), while site 9 is at the southern tip of Palawan (facing the South China Sea and the Spratlys). This dual orientation — hedging against both a Taiwan contingency and the South China Sea — is the essence of the additional sites. 注 The governors of Isabela and Cagayan have opposed the sites, arguing they would "make the province a target" — an easily overlooked point being that local political opposition can affect implementation.
6-3. US Funding and Deployments (2023–2026)
| Timing | Detail |
|---|---|
| 2023 | $66.5 million for facility construction at 3 EDCA sites |
| August 2024 | The Biden administration announces an additional $500 million in military assistance (FMF) |
| February 2025 | US-Philippines joint fighter patrol conducted over the South China Sea |
| February 2026 | The US Army stands up "Army Rotational Force-Philippines"; agreement reached on expanding missile-related capabilities |
| July 2026 | Up to $9 million for expanding the PCG pier at Palawan |
6-4. Typhon (Mid-Range Capability, MRC)
| Item | Detail |
|---|---|
| What it is | A US Army ground-based launcher (made by Lockheed Martin) that packs 4 Mk41 VLS strike-length cells into a 40-foot container form factor |
| Munitions | Can fire SM-6 and Tomahawk missiles |
| Deployment | Airlifted to an airfield in northern Luzon by C-17 in April 2024 (1st Multi-Domain Task Force / 1st MDTF), timed with exercises Salaknib 24 and Balikatan 24 |
| Point of contention | Its range covers not just the entire Luzon Strait but also mainland China's coastline and PLA installations in the South China Sea. China has protested strongly and demanded its removal; the Philippines has refused, and what was initially described as a deployment of "a few months" has been extended |
| 2026 | On 5 May 2026, during Balikatan 2026, a Tomahawk was fired from Tacloban airport and struck a target at Fort Magsaysay (about 390 miles), recorded as the first live-fire launch within Philippine territory |
| Acquisition intent | In December 2024, the Philippine military stated its intention to acquire Typhon (whether an acquisition contract has been finalized remains unconfirmed as of August 2026) |
注 "The Philippines has purchased Typhon" is still incorrect. What exists is a US military deployment and a stated Philippine intent to acquire it — many articles conflate the two. 注 Details of the 2026 live-fire event (launch site, range, munition type) are drawn from timeline-level reporting; primary-source confirmation is advisable (verification recommended).
6-5. Balikatan ("Shoulder to Shoulder")
| Year | Notable features |
|---|---|
| 2024 (39th iteration) | 22 April–10 May, Batanes and Palawan. Retired vessel BRP Lake Caliraya used as a target ship. 14 countries as observers |
| 2025 | Japan participates as a "full participant" for the first time. US Marine Corps' NMESIS anti-ship missile system deployed |
| 2026 | Begins 20 April, largest ever over 19 days. Japan and Canada join as full participants, with Australia, France, and New Zealand also taking part. 注 Some accounts describe Japan's "first participation" as occurring in 2026, while others date full participation to 2025 — take care with the differing definitions of participation tier (observer/partial/full) |
7. The Philippine Coast Guard's (PCG) Place in the System
| Item | Detail |
|---|---|
| Affiliation | Under the Department of Transportation (DOTr) in peacetime, an attached agency of the Department of National Defense in wartime. Transferred from DND in 1998 |
| Personnel | 36,000 (2026, 注 multiple sources cited, primary source unconfirmed). 注 Japanese-language material still often carries the older figure of ~20,000 |
| Budget | ₱42.51 billion (~$724 million) (2026) |
| Commandant | Adm. Ronnie Gil L. Gavan, since 20 October 2023 |
| Main vessels | 10 Parola-class 44-meter-class ships (built in Japan); 2 Teresa Magbanua-class 97-meter-class ships plus 5 more ordered (built in Japan) |
| 2026 | On 10 April 2026, the PCG opened a coast guard district base on Pag-asa (Thitu) Island in the Kalayaan Island Group, making the country's effective presence more visible |
Why the "coast guard" — not the military — takes the lead: this keeps confrontations with the Chinese coast guard confined to a law-enforcement-to-law-enforcement level, avoiding military escalation. The Philippines has deliberately placed the PCG at the front line, operating in the gray zone below the threshold (armed attack) that would trigger the US-Philippines MDT. The PCG's practice of proactively releasing footage — its "Assertive Transparency" operations — fits the same logic.
8. Human Resources — Reserves, ROTC, and the Conscription Debate
8-1. Is There Conscription?
- The Philippines has no conscription (compulsory military service); it is an all-volunteer force. The Constitution contains a provision that could allow mandatory service to be imposed, but no enabling law exists.
- 注 Reports that "conscription has been introduced in the Philippines" surface periodically, but as of August 2026 no such law has been enacted. The substance of the ongoing debate is the ROTC-mandate issue described below.
8-2. ROTC (Reserve Officers' Training Corps)
| Timing | Detail |
|---|---|
| 1912 | Origins trace to military drill at the University of the Philippines; the first formal ROTC unit formed 3 July 1922 |
| 1935 National Defense Act | Made mandatory at universities with over 100 students |
| 2001 | The Mark Chua case — a Santo Tomas University ROTC cadet was killed after exposing corruption, sparking a backlash against the program |
| 2002 | Republic Act No. 9163 (the NSTP Law) made ROTC elective, folding it into the National Service Training Program (NSTP)'s three tracks (CWTS = civic welfare / LTS = literacy / ROTC), one of which is taken over two semesters |
| Effect | Enrollment fell from ~800,000 in AY1999–2000 to ~150,000 by 2011, and the number of participating schools collapsed from 2,000 to 500 |
| 2022– | President Marcos designated mandatory ROTC for senior high school as a priority bill in his 2022 State of the Nation Address, and bills have repeatedly been filed in both chambers since |
| As of August 2026 | ROTC remains elective. Opposition from student groups and civil society (over concerns of human-rights abuses, hazing, and corruption) remains entrenched |
8-3. Reserves
- Legal basis: Republic Act No. 7077 (the Citizen Armed Force / AFP Reservist Act), which governs the Reserve Force.
- Oversight: the AFP Reservist Command (AFPRESCOM). Its commander is Brig. Gen. Ferdinand Geminic P. Ramirez (since 14 August 2024).
- Categories: Ready Reserve / Standby Reserve / Retired Reserve.
- Training: Basic Citizen Military Training (BCMT), and Military Orientation Training (MOT) for corporate/AFP-affiliated reserve units.
- 注 A central argument of mandate advocates is that ROTC's shift to elective status has narrowed the supply of officer-reserve candidates, degrading the "quality" of the reserve force. The conscription debate is best understood, fundamentally, as an argument for rebuilding the reserves.
9. Defense Industry — Attempts at Domestic Production
| Item | Detail |
|---|---|
| Origins | The Self-Reliant Defense Posture (SRDP). Established by Presidential Decree No. 415 on 19 March 1974 (Marcos Sr. administration). Included Project Santa Barbara (rockets) and licensed production of the M16A1 (over 150,000 rifles). 注 It failed to become self-sustaining due to reliance on imported materials |
| Revival law | Republic Act No. 12024, signed by President Bongbong Marcos on 8 October 2024. Relaunches the SRDP and institutionalizes a "Filipino-first" preference in procurement |
| Domestic projects | Project BUHAWI (a remote weapon station for 12.7mm guns), Project COBRA (an automated gun mount for armored vehicles), and the AFRDC's VTOL drone (AMOC/MAOY, capable of dropping munitions) |
| Technology transfer | An agreement with Israel for domestic assembly of the Shaldag Mk V fast attack craft; Indian companies have proposed local production of missiles and air-defense systems |
| Economic zone | A defense economic zone (SpeDEZ) in Bataan was approved in 2025, aimed at manufacturing advanced electronic components and composite materials |
| State armory | Government Arsenal (GA): established 22 June 1957, directly under the DND. Produces small-arms ammunition (5.56/7.62/9mm/.50 cal., etc.), the M16 rifle, and body armor/helmets. 576 employees (2024), a ₱1.30 billion budget (2020). 注 A 2016 Commission on Audit (COA) report flagged production delays caused by aging equipment (12 to 39 years old) |
| Shipbuilding | Agila Subic Shipyard: the former Hanjin shipyard (built 2006–2009, peak workforce 35,000). After the operator's 2019 bankruptcy, US-based Cerberus Capital acquired it in 2022. The Philippine Navy uses the northern section as "Naval Operating Base Subic." HD Hyundai Heavy Industries plans to move in by around January 2026, establishing a maintenance hub for the Jose Rizal- and Miguel Malvar-class ships |
注 "The Philippines has started making its own weapons" is easy to overstate. In reality, activity is concentrated in (a) small arms and ammunition, (b) small systems such as gun turrets and drones, and (c) domestic assembly and maintenance (MRO) of foreign designs. As of August 2026, there is no domestic design-and-production capability for frigates, fighter jets, or missile systems themselves. Analysts point to the high cost of domestic production, gaps in heavy-industry technology, and a history of abandoned programs as persistent challenges.
10. Key Developments in 2025–2026 (Timeline)
| Date | Event |
|---|---|
| 2025-01-20 | AFP detains 3 Chinese nationals, including Deng Yuanqing, on espionage charges (surveillance of critical infrastructure) |
| 2025-03-04 | An Air Force FA-50PH crashes in Bukidnon, killing 2 (anti-NPA operation) |
| 2025-03-11 | Former President Duterte detained under an ICC arrest warrant and transferred to the Netherlands (a turning point for domestic security policy) |
| 2025-04-20 | 2nd BrahMos battery delivered (by sea) |
| 2025-04-30 | Visiting Forces Agreement (VFA) signed with New Zealand |
| 2025-05-20 | BRP Miguel Malvar (FFG-06) commissioned |
| 2025-07-06 | Japan and the Philippines enter talks on transferring Abukuma-class escort ships |
| 2025-07-23 | Marcos-Trump meeting; trade deal reached at a 19% tariff, including security-cooperation provisions |
| 2025-07-31 | Lt. Gen. Nafarrete becomes Army Commander |
| 2025-08-03 | India and the Philippines hold their first joint naval exercise in the West Philippine Sea |
| 2025-08-11 | Chinese Coast Guard and PLA Navy vessels collide with a Philippine government ship near Scarborough Shoal (during removal operations) |
| 2025-09-11 | The Japan-Philippines Reciprocal Access Agreement (RAA) enters into force |
| 2025-09-16 | A BFAR vessel near Scarborough Shoal is hit by Chinese Coast Guard water cannon, injuring 1 crew member |
| 2025-09 | China announces a "nature reserve" at Scarborough (Huangyan) Shoal; the Philippines denounces it as a pretext for occupation |
| 2025-12-02 | BRP Diego Silang (FFG-07) commissioned |
| 2026-01-12 | Announcement of the CIWS/towed-array-sonar retrofit for the Jose Rizal class (₱5.349 billion) |
| 2026-01-15 | Japan-Philippines ACSA signed (reciprocal provision of ammunition, fuel, etc.); same day, exchange of notes for the FY2025 OSA project (¥900 million) |
| 2026-02-12 | Mongolian national arrested on espionage charges near critical infrastructure in Iba, Zambales |
| 2026-02 | The US Army stands up "Army Rotational Force-Philippines," agreeing to expand missile-related capabilities |
| 2026-02-24 | BRP Rajah Sulayman (PS-20) commissioned |
| 2026-04-10 | The PCG opens a coast guard district base on Pag-asa (Thitu) Island |
| 2026-04-16 | The Philippines joins the US-led "Pax Silica" initiative |
| 2026-04-20 | Balikatan 2026 begins (19 days; Japan and Canada as full participants, with Australia, France, and New Zealand also joining) |
| 2026-04-21 | (On the Japanese side) The operational guidelines under the Three Principles on Transfer of Defense Equipment and Technology are said to be substantially revised, reportedly abolishing the "5 categories" restriction |
| 2026-05-05 | Typhon fires a Tomahawk from Tacloban airport, striking a target at Fort Magsaysay; Defense Minister Koizumi visits the Philippines the same day |
| 2026-05 | President Marcos visits Japan. Agreement reached on strengthening arms sales, information sharing, and joint exercises; maritime boundary delimitation talks begin |
| 2026-06-09 | BRP Rajah Lakandula (PS-21) commissioned |
| 2026-06-11 | China sanctions Secretary Teodoro and his family, imposing an entry ban |
| 2026-07-07 | The Philippine side confirms acquisition of 5 of 6 Abukuma-class ships (transfer to follow JMSDF retirement in 2027) |
| 2026-07-20 | A Philippine naval officer is injured by Chinese Coast Guard personnel at Second Thomas Shoal |
| 2026-07-21 | Gen. Nafarrete becomes AFP Chief of Staff (Gen. Brawner completes his term) |
| 2026-08-22 | The Japan-Philippines ACSA enters into force |
11. 注Summary of "Points That Trip People Up"
| # | Common error | The correct understanding |
|---|---|---|
| 1 | 注"The AFP's top officer is Gen. Brawner" | As of 21 July 2026, it is Gen. Nafarrete. The Chief of Staff now serves a fixed 3-year term (RA 11939) |
| 2 | 注"Re-Horizon 3 covers 2023–2028" | A roughly 10-year re-plan ($35 billion) approved in January 2024, restructuring the original Horizon 3 envelope |
| 3 | 注"A $35 billion budget has been secured" | It is a planned requirement, not a secured amount. The actual annual modernization allocation is around ₱90 billion for 2026 |
| 4 | 注"There are 4 Jose Rizal-class frigates" | There are only 2 Jose Rizal-class frigates. The Miguel Malvar class (2 commissioned + 2 on order) is a separate class |
| 5 | 注"Submarines are being acquired" | Still at the concept stage. A submarine group has been pre-positioned within the fleet, and France's Naval Group has only proposed the Scorpène class |
| 6 | 注"The Philippines has purchased Typhon" | Only US forces have deployed it. The Philippine side has stated an intent to acquire it (December 2024), but a contract remains unconfirmed |
| 7 | 注"Japan made its first postwar arms export" | The accurate description is "the first complete-equipment export under the Three Principles on Transfer of Defense Equipment and Technology" (Mitsubishi Electric, 28 August 2020, 4 radar units) |
| 8 | 注"Japan exported (sold) destroyer escorts to the Philippines" | It is a transfer of used Abukuma-class ships, under the OSA (grant, free of charge) framework. 5 ships (the initially reported 6 is outdated) will transfer after JMSDF retirement (expected 2027). The cost-sharing for armament configuration and refit remains undetermined |
| 9 | 注"The coast guard is part of the military" | A civilian agency under the Department of Transportation in peacetime; under the DND only in wartime — which is exactly why it is placed on the front line |
| 10 | 注"Conscription has been introduced" | There is no conscription. The live issue is mandatory ROTC, which as of August 2026 remains unenacted (elective since RA 9163 in 2002) |
| 11 | 注"Defense spending is $4.31 billion / 0.97% of GDP" | That is the outdated 2023 figure. For 2026, the AFP budget is said to be ₱395.872 billion, 1.35% of GDP (注 primary source unconfirmed). AFP budget / DND budget / SIPRI figures all use different definitions |
| 12 | 注"Reserves number 1.8 million" | That is the registered-roster figure. Ready Reserves number about 86,000 (2023, AFPRESCOM) |
| 13 | 注"Ranked #X in military strength worldwide" | Mostly traces to a private ranking (Global Firepower). Not an official indicator. This article treats it as unconfirmed |
| 14 | 注"The Philippines has fighter jets" | The FA-50 is a light fighter derived from a trainer. A true multirole fighter (MRF) has not yet been procured |
| 15 | 注"There is a domestic weapons industry" | In reality, it consists of small arms, ammunition, and small systems, plus domestic assembly and maintenance (MRO) of foreign designs. RA 12024 (8 October 2024) marks an attempt to revive it |
12. Structural Summary — Three Tensions in Philippine Defense
- The tension between "threat perception" and "budget": confrontation with China in the South China Sea occurs almost monthly, yet the defense budget's share of GDP sits in the low single digits. The scale of the stated requirement ($35 billion) and actual spending (roughly $1.5 billion/year) simply do not match — this is the bottleneck underlying everything else.
- The tension between "the military" and "the coast guard": to avoid escalation, the most dangerous front-line work falls to the coast guard — a civilian agency under the Department of Transportation — rather than the military. As a result, the PCG's equipment and personnel have expanded rapidly, and Japanese ODA has become its primary source of funding.
- The tension between "internal" and "external" orientation: an Army-centric force of 11 infantry divisions was built for an inward-facing war against communist insurgents (the NPA) and Islamist armed groups. Shifting resources toward external defense (sea, air, missiles) requires rebuilding the organization itself. Chief of Staff Nafarrete's July 2026 inaugural call for "a shift to external and territorial defense" is a declared response to precisely this challenge.
日本語の詳細版: 分野「外交・安全保障・南シナ海」「軍事・防衛」(本サイト日本語版)。