Philippine information you can trace to its source 日本語JAEnglishENTagalogTL
Home › Regions & the Bangsamoro › The Visayas

The Visayas

As of 2026-09-08 · Updated 2026-09-08 · Section: Regions & the Bangsamoro · 日本語版


1. Overview

The Visayas is the island group occupying the central Philippine archipelago — one of the country's "three great island groups" alongside Luzon and Mindanao. Land area: 71,503 km². 2024 population: 21,033,659 (roughly 21.03 million). Population density: approximately 294 people/km².

The population figure is confirmed as the sum of the 2024 regional census releases from the Philippine Statistics Authority (PSA): Western Visayas 4,861,911 + Negros Island Region (NIR) 4,904,944 + Central Visayas 6,640,875 + Eastern Visayas 4,625,929 = 21,033,659. The national total of 112,729,484 was officialized by Presidential Proclamation No. 973 (11 July 2025). 注 psa.gov.ph itself returned an an access refusal bot-detection error during verification, so these figures were confirmed through search-index excerpts of each regional release rather than the primary PSA documents directly — meaning some primary sources remain unreached as of this writing.

The six main islands are Panay, Negros, Cebu, Bohol, Leyte, and Samar. Smaller islands scattered around them include Siquijor, Guimaras, Biliran, Romblon, and Masbate.

注 The theory tracing the origin of the word "Bisaya" to the Srivijaya empire is widely repeated but linguistically doubtful. Linguist Eugene Verstraelen has pointed out that, based on the sound changes typical of Sanskrit loanwords, "Vijaya" should have become "Bidaya" or "Biraya" in Philippine languages — not "Bisaya." Japanese-language sources often state the Srivijaya connection as settled fact, so caution is warranted.


2. Four regions — the 2024 redistricting

For a long time, the Visayas consisted of three regions: Western Visayas (Region VI), Central Visayas (Region VII), and Eastern Visayas (Region VIII). That changed with Republic Act No. 12000 (the Negros Island Region Act, signed by President Marcos on 11 June 2024), which created the Negros Island Region (NIR) — bringing the Visayas to four regions.

NIR consists of Negros Occidental (including Bacolod City), Negros Oriental, and Siquijor. The first two were carved out of Western Visayas and Central Visayas respectively, and Siquijor out of Central Visayas. The country's total number of regions rose from 17 to 18.

(The signing date is confirmed as 11 June 2024, not 13 June as an earlier draft stated — the original text of RA 12000 posted on Lawphil is stamped "Approved: JUN 11 2024." Source: lawphil.net/statutes/repacts/ra2024/ra_12000_2024.html.)

注 NIR is a "revival," not a brand-new creation. President Aquino first established it by Executive Order No. 183 in 2015, and the Duterte administration abolished it in 2017 citing insufficient funding. This time it was established by statute, so it cannot be dissolved as easily as an executive order.

Comparing the four regions

Region Main provinces Center city 2025 GRDP 2025 growth rate 2023 poverty rate (households)
Western Visayas (Region VI) Iloilo, Aklan, Capiz, Antique, Guimaras Iloilo City ~₱683.4 billion 6.4% (fastest of all 18 regions in 2025) 9.8% (below the national average of 10.9%)
Negros Island Region (NIR) Negros Occidental, Negros Oriental, Siquijor Bacolod City ~₱671.7 billion 5.7% 22.6% (third-highest nationally)
Central Visayas (Region VII) Cebu, Bohol Cebu City ~₱1.32 trillion (5.7% national share — 4th) 3.7% Not confirmed (full-year 2023 figure could not be verified)
Eastern Visayas (Region VIII) Leyte, Southern Leyte, Biliran, Samar, Eastern Samar, Northern Samar Tacloban City ~₱560.7 billion 1.0% (sharply slowed by the PASAR shutdown) 20.3%

Source: Philippine Statistics Authority (PSA), Regional Accounts and the 2023 Family Income and Expenditure Survey (FIES).

(Central Visayas's 2025 GRDP figure — ₱1.32 trillion, 3.7% growth, 5.7% national share, 4th place — comes from PSA's "2025 Regional Economic Accounts," published 23 April 2026, and is consistent with figures cited elsewhere in this site's coverage of major cities and business districts.)

Central Visayas led all 18 regions with 7.3% growth in 2024, with an economy of roughly ₱1.28 trillion — 5.7% of national GDP — and a per-capita GRDP of ₱187,520 (PSA). That this figure held even after handing Negros Oriental and Siquijor over to NIR is significant. 注 But growth slowed sharply to 3.7% in 2025 (see table above). The claim that "Central Visayas is the nation's fastest-growing region" applies to 2024; in 2025 the fastest-growing region nationally was Western Visayas (6.4%). Per-capita GRDP also moves year to year — ₱187,520 in 2024 → ₱192,739 in 2025 — so always specify the year when citing it.

Eastern Visayas's 2025 slowdown was driven mainly by the February 2025 shutdown of PASAR (Philippine Associated Smelting and Refining), the country's only domestic copper smelter, located in Isabel, Leyte (a Glencore subsidiary with roughly 200,000 tons/year of copper cathode capacity). Manufacturing in the region contracted 9.6%. The Regional Development Council (RDC) has since called for industrial diversification, saying the region had become "too dependent on PASAR."


3. Cebu — hub of commerce and logistics

Population (2024 Census — POPCEN, PSA)

Unit Population
Cebu Province (excluding its three highly urbanized cities) 3,400,522
Cebu City 965,332
Lapu-Lapu City (Mactan Island) 497,813
Mandaue City 364,482
Talisay City 263,832
Bohol Province (for reference) ~1.41 million

注 The "3,400,522" figure for Cebu Province does not include Cebu City, Lapu-Lapu City, or Mandaue City. These three are counted separately from the province as highly urbanized cities (HUCs), so simply writing "Cebu Province = 3.4 million" understates the area's true population.

Central Visayas's population growth rate plunged from 2.04%/year (2015–2020) to 0.35%/year (2020–2024) (PSA). Cebu City itself was essentially flat (+0.03%/year) — as in Metro Manila, the urban core has plateaued while growth shifts to the periphery.

Cebu IT Park

Cebu IT Park is the largest IT-BPM cluster outside Metro Manila, and it's often the first choice for Japanese companies scouting offshore locations. Mactan Island, meanwhile, has developed a distinct role centered on the Mactan Export Processing Zone (MEPZ), drawing manufacturing and export-oriented industry.

Transport infrastructure

Project Status
CCLEX (Cebu–Cordova Link Expressway) 8.9 km long, opened 30 April 2022, cost roughly ₱33 billion. A cable-stayed bridge with 145m towers, designed for 50,000 vehicles/day. Cuts about 40 minutes off the alternate route to Mactan International Airport. Operated by a Metro Pacific affiliate
Cebu Bus Rapid Transit (CBRT) Partially opened 13 March 2026 — the Philippines' first BRT. Package 1 covers 2.38 km (Cebu South Bus Terminal to Osmeña Boulevard); the actual operating stretch runs from SRP's Il Corso to IT Park. Free of charge during morning/evening rush for now, with projected ridership of 34,000/day
CBRT's challenges Project cost ballooned from ₱16.3 billion to ₱28.78 billion. The World Bank has withdrawn financing for Packages 2 and 3. Full-line opening is targeted for 2027
Mactan-Cebu International Airport (MCIA) The largest international airport outside Metro Manila; Terminal 2 is known for its timber-roof design

The 30 September 2025 Cebu earthquake (important)

Item Detail
Occurrence 30 September 2025, 9:59 PM local time
Magnitude Mw 6.9 (PHIVOLCS initially reported 6.7, later revised upward)
Epicenter About 17–21 km northeast of Bogo City in northern Cebu, 5–10 km deep
Causative fault The onshore extension of the Bogo Bay Fault — newly named after this earthquake
Deaths 79 (NDRRMC, as of 17 October 2025; injury counts range from 559 to 1,271 depending on the source)
Damage cost ~₱16.23 billion, of which ~₱12.69 billion was school damage — roughly 500 schools damaged
Affected Around 748,000 people (260 barangays)
Aftershocks Over 12,079 of M1.0 or greater; the largest was an M5.8 on 13 October, which knocked out power across all of Bogo

This was the deadliest earthquake in the Philippines since the 2013 Bohol earthquake, and the strongest ever recorded in northern Cebu. PHIVOLCS Director Bacolcol has said it was "both a natural disaster and a consequence of non-compliance with building codes."

Recovery as of 2026: Bogo City, under Mayor Martinez, adopted the "Build Back Better Bogo" framework (Executive Order No. 89), targeting a three-year recovery. The tent city was closed in February 2026. In June of that year, a third round of cash assistance — ₱10,000 each to 3,215 households — was disbursed (totaling ₱473.58 million for northern Cebu). Even so, eight months after the quake, housing and school reconstruction remain behind schedule, and the "no-build zone" directly over the fault line is complicating residents' efforts to rebuild their lives. At the provincial level, Governor Pamela Baricuatro has led a one-year fast-track recovery plan.


4. Bohol

The 15 October 2013 Bohol earthquake

The Chocolate Hills resort controversy (2024) — "a detail easy to get wrong"

In March 2024, video of the "Captain's Peak Garden and Resort" in Sagbayan — built right in the middle of the hills — went viral and sparked outrage on social media. In fact, the DENR (Department of Environment and Natural Resources) had already issued a cease-and-desist order on 6 September 2023 and a notice of violation on 22 January 2024 for the resort's lack of an Environmental Compliance Certificate (ECC) — the case had been moving through official channels well before it went viral. The resort also had no Department of Tourism accreditation. 注 The claim that spread online in March 2024 that "the resort was demolished" is incorrect — in reality it was only ordered to close temporarily. UNESCO's Philippine office has noted the site could lose its Geopark status at its next review in 2027.

Bohol-Panglao International Airport (BPIA)


5. Negros — sugar, haciendas, and geothermal power

The sugar industry and the hacienda system

Issue Situation in 2025–2026
Wages Around 300,000 households on Negros are tied to hacienda work. One plantation in Cadiz City reportedly paid ₱2,500 for two weeks' work (about ₱250/day) — well below the region's statutory minimum agricultural wage of ₱520.
Labor disputes In July 2026, 28 plantation workers sued landowners over unpaid 13th-month pay and Sugar Adjustment Bonus (SAB); the defendants were representatives of the CONFED sugar-millers association.
Red-Striped Soft Scale (RSSI) infestation First appeared in the north in late March 2025; confirmed damage reached 16,019 hectares as of 26 June 2026 (14,448 ha in Negros Occidental across 5,435 farmers and 365 barangays; 1,571 ha in Negros Oriental). Land under "threat" totals 76,632 ha — 32% of planted area. Said to cut sugar content by up to 50%.
Response The Sugar Regulatory Administration (SRA) has requested emergency powers; the Department of Agriculture has funded pesticides. Trials include deploying parasitic wasps as natural predators and spraying entomopathogenic fungi around field perimeters as a "biological barrier."
Policy turmoil Sugar Orders No. 2 and 3, issued by the SRA on 9 January 2026 (requiring one bag out of every four domestic bags purchased at ₱2,300 each to be set aside for export at ₱1,100), drew unified opposition from major groups including PSMA, CONFED, NFSP, and PanayFed.
Legislation In August 2026, the House Committee on Agriculture and Food began deliberating reform bills — one to add worker, agrarian-reform-beneficiary, and consumer representation to the SRA board (HB 8376), another to amend the 2015 Sugarcane Industry Development Act (RA 10659, HB 9088).

Bacolod's MassKara Festival was born out of the collapse of this sugar economy. Amid the double blow of the early-1980s global sugar-price crash (driven by the spread of high-fructose corn syrup) and the sinking of the passenger ship Don Juan in April 1980, the "City of Smiles" launched the festival in 1980. It ran 1–19 October in 2025.

Geothermal power — Negros as a "renewable-energy island"

Facility Detail
Palinpinon Geothermal Valencia, Negros Oriental. 192.5 MW. Unit 1 began operating in 1983, marking 40 years in service in 2023.
Southern Negros Geothermal Project (SNGP) Combines Palinpinon I & II, Nasulo, and Nasuji for a dependable capacity of 221.8 MW, drawn from 94 wells across 32 pads.
Upgrade investment EDC subsidiary Green Core Geothermal is boosting Palinpinon Unit 1 (112.5 MW) to 126 MW (3 × 42 MW) at a cost of roughly ₱3.02 billion; EDC plans expansions across the whole SNGP worth roughly ₱25 billion.
Ordinance Negros Oriental passed a Renewable Energy Ordinance (Ordinance No. 30) in 2021, banning new fossil-fuel power plants within the province.

*EDC (Energy Development Corporation) is the geothermal arm of the Lopez-affiliated First Gen group, and controls roughly 62% of the country's total geothermal capacity.


6. Panay Island / Iloilo — gateway to Boracay

Iloilo City

Boracay

注 Boracay is not part of Cebu — it belongs to the town of Malay, Aklan Province, off the northwest coast of Panay Island, in Western Visayas. Access is via Caticlan Port and Godofredo P. Ramos (Caticlan) Airport on the mainland side.

Indicator Figure
2025 tourist arrivals 2,155,217 (2024: 2,077,977), of which 1,765,282 were domestic visitors
2025 tourism revenue ~₱47 billion
Peak month December 2025: 227,828
Carrying capacity 19,215 people on-island per day / 6,405 new arrivals per day (set after the 2018 closure and rehabilitation; the DILG confirmed the cap remained in force as of 2022)
Cap exceeded During Holy Week 2025; on Holy Thursday the on-island population was estimated at roughly 29,056
Recognition Voted "World's Best Beach" in Condé Nast Traveler's 2025 reader survey
2026 target 2.3 million arrivals

Even though the annual total stays within the cap, the structure is such that the limit is blown through at specific peak moments, and observers note that the DENR's overcapacity warnings have in practice become infrequent (the most recent was in April 2022).

The Panay–Guimaras–Negros (PGN) Bridge

Section Length Cost / target date
Section A (Panay–Guimaras) 13.616 km ~₱57 billion / targeted completion 2028
Section B (Guimaras–Negros) 19.47 km ~₱109 billion / targeted completion 2030
Total ~33 km ~₱167.5 billion

注 Construction has been pushed back from the original schedule; as of March 2026 the target start date is "Q4 2027." Causes include the discovery that undersea foundations need to be driven deeper, land acquisition, and procedural issues tied to Korea Eximbank (KEXIM) financing. There is also opposition from conservation groups worried about the impact on the country's last remaining population of Irrawaddy dolphins, which survives in the Guimaras Strait.


7. Leyte and Samar (Eastern Visayas) — ground zero for Typhoon Yolanda

Typhoon Yolanda (Haiyan)

注 "Yolanda" is the Philippine domestic name; "Haiyan" is the international name — they refer to the same typhoon. Japanese-language sources sometimes treat them as two separate events.

Eastern Visayas's economy and poverty structure (2023, PSA)

Province/City Household poverty rate
Samar 24.9%
Eastern Samar 24.7%
Northern Samar 21.8% (the only one to worsen, due to major flooding in 2023)
Leyte (excluding Tacloban City) 21.7%
Tacloban City (HUC) 10.6%
Biliran 8.5%
Southern Leyte 7.1%

注 Tacloban City sits on Leyte Island, but administratively it is a highly urbanized city separate from Leyte Province — its figures are not included in the province's statistics.

The three Samar provinces consistently rank among the poorest in the country, while Southern Leyte and Biliran fall below the national average. Lumping "Eastern Visayas" together as simply "poor" misses this internal contrast.

Geothermal — Leyte is the country's largest geothermal zone

Politics

Martin Romualdez, representative of Leyte's first district, served as House Speaker from 2022 but resigned in 2025 amid the "ghost flood-control projects" scandal. Scrutiny has continued since — through the Independent Commission for Infrastructure (ICI), a Senate minority report, and an Ombudsman complaint filed in July 2026 — which he has denied in full. 注 The flood-control scandal has spilled over into Eastern Visayas's economic statistics as well: the halt of infrastructure projects in the second half of 2025 shrank the region's construction sector by 2.4%.


8. Siquijor


9. Languages — the Visayan languages

Language Main distribution 2020 census: households speaking it at home
Bisaya/Binisaya Nationwide (a general self-reported category) 4,210,000 households (16.0%, 2nd nationally)
Hiligaynon (Ilonggo) Western Visayas, Negros Occidental 1,930,000 households (7.3%)
Cebuano (Bisaya) Cebu, Bohol, Negros Oriental, western Leyte, northern Mindanao 1,720,000 households (6.5%)
Waray (Waray-Waray) Samar, eastern Leyte, Biliran 698,745 households (2.6%)
Others Aklanon, Kinaray-a, Capiznon, Boholano, Masbateño, etc. —

注注 The PSA tallies "Bisaya/Binisaya" and "Cebuano" as separate categories. Because many Cebuano speakers self-report their language simply as "Bisaya," quoting "Cebuano 6.5%" as if it represented the true share of Cebuano speakers massively understates it. The actual number of Cebuano speakers is estimated at around 20 million, making it the country's second most-spoken language after Tagalog.

Practical points to know: - Negros Island has a language boundary running Hiligaynon in the west (Occidental), Cebuano in the east (Oriental) — even within the single "Negros Island Region," the language differs, which partly explains uneven enthusiasm for the NIR merger. - Leyte splits similarly: Cebuano in the west, Waray in the east (the Tacloban side) — a divide within a single province. - Hiligaynon is known for its soft intonation, and its speakers commonly call themselves "Ilonggo." - "Bisaya" functions as a language name, an ethnic/people name, and a regional name all at once — context determines which sense applies.


10. Magellan and Lapu-Lapu — the Battle of Mactan (27 April 1521)


11. Practical notes for business travel and investment

Consideration Point
Site selection For IT-BPM, Cebu IT Park; for manufacturing and export, Mactan (MEPZ); for a lower-cost secondary site, Iloilo Business Park or Bacolod (the Next Wave City tier).
Earthquakes Bohol (2013, M7.2) and northern Cebu (2025, M6.9) — two major earthquakes in 12 years. Understanding of local faults is still incomplete, to the point that faults get "newly named" after the fact. It is worth physically verifying a building's seismic compliance before committing.
Typhoons Eastern Visayas (Samar and Leyte) tends to be the first point of landfall on the Pacific side. Build business continuity plans on the assumption that a Yolanda-scale storm could happen again.
Power Geothermal (Leyte / southern Negros) forms the regional backbone, but small islands like Siquijor carry the risk of year-scale outages from dependence on a single operator.
Reading the statistics Regional statistics from 2024 onward are discontinuous with earlier years because of the NIR split — do not compare them directly against pre-2023 figures.
Language Cebu/Bohol = Cebuano; Iloilo/Bacolod = Hiligaynon; Tacloban = Waray. English works, but on-the-ground primary information circulates in the local language.

日本語の詳細版: 分野「地方・地域」「ビサヤ諸島」(本サイト日本語版)。